GTR 115133987
Tenders Are Invited For Construction Work – József Ált School Of Péczeli And Ami Infrastr. Development.
ICB — International Competitive Bid
Closes Jul 29, 2026
central europe
Tender Information
GTR Reference
115133987
Tendering Authority
Subscribe to view
Tender No
442044-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – József Ált School Of Péczeli And Ami Infrastr. Development.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
29-07-2026
Work Detail
Construction Work – József Ált School Of Péczeli And Ami Infrastr. Development.. Bt-24 Continued: The Expected Value Of The Peak Consumption Is 62.2 L/Min. Dhw Supply Is Planned Individually With Electric Hot Water Storage Tanks Installed Near The Consumption Points. The Planned Hot Water Storage Tanks Are Placed High To Avoid Unauthorized Interventions. A Combined Safety Device Is Installed At The Connection To The Cold Water Side Of The Dhw Tanks. In Order To Eliminate The Risk Of Scalding And Taking Into Account Consumption Demand, The Temperature Of The Stored Hot Water Is Limited To Thmv = 50°C. Among The Furnishings, The Mobility-Restricted Washroom And Toilet, Normal Toilets And Urinals Were Designed With The Mounting Frame Design Specified In The Technical Description. The Mounting Frame Of The Mobility-Restricted Toilet Also Ensures The Placement Of The Handrail. The Flushing Of The Toilet Is Pneumatically Actuated, With 2 Volumes, Installed Below The Wall Level.. The Operation Of The Urinals - In Order To Exclude Unpleasant Odors - Is Provided Electronically, In Mains Operation. A Urinary Partition Is Placed Between The Urinals. The Installation Frames Are Made With Plasterboard Covering The Entire Height Of The Room. The Base And Branch Line Providing Cold And Hot Water Supply Was Designed From The Pipeline Specified In The Technical Description, In The Form Of A Splicing Sleeve, Thermally Insulated With A Pipe Shell, And Placed In A Wall Groove Or In The Floor. Before Putting The Installed System Into Operation, It Must Be Disinfected And A Water Sample Taken. For The Discharge Of The Generated Wastewater, We Planned An Exit Near The Places Of Origin, The Amount Of Which Is The Same As The Daily Water Demand. The Ventilation Lines Must Be Routed Above The Roof. Tasks Of A Quality Management/Assurance Specialist: Coordination Of Various Specialized Industrial Works, Subcontractor Coordination, Coordination Of Quality Assurance Of Various Technological Processes. Ensures Proper Documentation Of Work Processes And Controls. It Plays A Connecting Role Between The Investor, The Technical Inspector And The Contractor In Enforcing Quality Expectations. For Some Products, References To A Specific Make Or Type Were Made Only In Order To Define The Subject Matter And Quality Requirements Of The Public Procurement In A Clear And Comprehensible Manner. (X.30.) Pursuant To Section 46 (3) Of The Government Decree, The Bidder Also Accepts A Product That Is Equivalent In All Respects.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
774aceb7-d0d0-49f1-82ea-19045da4160e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.