GTR 115121164

Tenders Are Invited For Construction Work – Renovation Of The District Road (Formerly Provincial Road 366) At Km 0+000 ÷ Km 3+974 And Km 7+505 ÷ Km 24+176 With A Total Length Of 19,505 (Excluding The Section Km 13+500 ÷ Km 14+640)

ICB — International Competitive Bid Closes Jul 31, 2026 central europe
Tender Information
GTR Reference
115121164
Tendering Authority
Subscribe to view
Tender No
445791-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – Renovation Of The District Road (Formerly Provincial Road 366) At Km 0+000 ÷ Km 3+974 And Km 7+505 ÷ Km 24+176 With A Total Length Of 19,505 (Excluding The Section Km 13+500 ÷ Km 14+640)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
31-07-2026
Work Detail
Construction Work – Renovation Of The District Road (Formerly Provincial Road 366) At Km 0+000 ÷ Km 3+974 And Km 7+505 ÷ Km 24+176 With A Total Length Of 19,505 (Excluding The Section Km 13+500 ÷ Km 14+640). 1. The Subject Of The Order Is The Renovation Of A District Road (Former Provincial Road No. 366) And Engineering Structures At Km 0+000 ÷ Km 3+974 And At Km 7+505 ÷ Km 24+176 With A Total Length Of 19,505 M (Excluding The Section: Km 13+500 ÷ Km 14+640). 2. Due To The Different State Of Surface Degradation And Parameters Of The Existing Road, The Following Scope Of Works Is Planned - In The Order Of Their Execution In The Years: 2024-2029: 1) Stage I - At Km 10+640 ÷ 12+010 Ul. Topolowa (Marczyce) - Excluding The Scope Carried Out In 2025 As Part Of A Separate Task; 2) Stage Ii – At Km 14+640 ÷ 16+100 Through Sosnówka, Miłków; 3) Stage Iii – At Km 7+505 ÷ 8+955 Through Zachełmie And Podgórzyn (To The Roundabout); 4) Stage Iv – At Km 16+100 ÷ 17+803 Through Miłków (To The Roundabout); 5) Stage Vm (Bridge Works) – At Km 17+836, 17+863 Miłków (Bridges Over The Łomnica Stream); 6) Stage Vd (Road Works) – At Km 17+910 ÷ 18+311 Through Miłków (From Bridge Structures); 7) Stage Vi – At Km 12+010 ÷ 13+420 Through Sosnówka; 8) Stage Vii – At Km 18+311 ÷ 19+461 Through Ścięgny; 9) Stage Viii – At Km 19+461 ÷ 24+184 Through Ścięgny, Kowary; 10) Stage Ix – At Km 8+955 ÷ 10+640 Through Podgórzyn (From The Roundabout); 11) Stage X – At Km 0+000 ÷ 3+974 Through Piechowice. 3. The Contractor Is Obliged To Implement The Stages Agreed With The Ordering Party In Parallel In Order To Meet The Deadline For Completing The Subject Of The Contract (Referred To In Section 1 Of Section Vi Of The Terms Of Reference), While Not Causing Collisions With Other Road Investments Being Implemented - Due To The Introduction Of Road Traffic Detours. 4. The Ordering Party Requires That The First Stage Of Implementation Of The Subject Of The Contract Is Stage Iii, Referred To In Section 2 Point 3. In Order To Maintain Traffic Flow And Avoid Traffic Paralysis In The Area Of ​​Stage Iii Works, Referred To In Section 2 Point 3, The Ordering Party Recommends That The Contractor Implement Stage Iii Simultaneously With The Implementation Of Stage Ii Referred To In Section 2 Point 2. 5. It Is Unacceptable To Implement Two Or More Stages In Parallel If It Would Lead To Disruption Of The Flow Of Traffic In The Area Of ​​Works Being Carried Out, In Particular It Is Not Allowed To Implement Stage Ii In Parallel, Referred To In Section 2 Point 2, With Stage Iv Referred To In Section 2 Point 4. 6. It Is Allowed To Start The Next Stage Of Works Before The Completion And Acceptance Of Another (Started Earlier) Stage - Provided That The Previously Started Stages Must Still Be Continued In Parallel With The New Stage. The Strategy For Implementing Individual Stages Of Works Cannot Cause Complete Traffic Paralysis Of Built-Up Areas. Connecting Subsequent Stages Must Be Organizationally Resolved In A Way That Ensures The Smoothness Of Road Traffic, Taking Into Account The Introduction Of Convenient, Shortest Detours - In The Event Of The Need To Carry Out Works In Sections While Completely Shutting Down Traffic, If Necessary. 7. A Detailed Description Of The Subject Of The Order/Scope Of Work Necessary To Be Performed Can Be Found In: 1) Description Of The Subject Of The Order, Constituting The Appendix
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1822cd15-0cf0-41c7-bc28-1391d5c122d3.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders