GTR 115002269
Request For Quotation Purchasing Spare Parts
ICB — International Competitive Bid
Closed
Central Asia
Tender Information
GTR Reference
115002269
Tendering Authority
Subscribe to view
Tender No
17259787
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
01-07-2026
Closed
Work Detail
Set Of Pipelines For The Cooling System Bts-4 Requirements For Metal Pipes: Materials (Steel 20, 30Khgsa, Aluminum Alloys) Must Have: - Have High Fatigue Strength; - Be Resistant To Internal Corrosion; - Withstand Temperature Changes; - Be Well Welded And Machined; - Have Sufficient Rigidity Of Shape. Main Parameters Of Pipes: Diameter (Internal) 8-57Мм Толщина Стенки1-3Мм Рабочая Температурадо 135°C Давление (Макс.)0,8 Мпа . Requirements For Flexible Pipelines (Sleeves): Rubber-Fabric Materials Must: - Be Oil And Fuel Resistant; - Maintain Elasticity At Low Temperatures (Up To −40 °C); - Withstand Elevated Temperatures Without Destruction; - Have Reinforcement (Fabric Or Metal) For Strength; - Be Resistant To Cracking And Aging. And Oils Types Of Connections: - Fittings According To Gost; - Union Nuts; - Seal; - Cone-Cone; - Copper Rings. Control And Testing. Опрессовка: 1.25–1.5 От Рабочего Давления, Контроль Герметичности. Комплектность: 1-Трубка От Насоса 54.02.120Сб-А. 2-Клапан Слива Воды - 166.02.27Сб. 3-Pipe 54.02.107Sba. 4-Труба От Двигателя К Змеевику - 155.02.115Сб-1Б. 5-Труба От Водяного Насоса - 54.02.45Сб-7Б. 6 -Трубка Отводная - 54.02.130Сб-А. 7.-Труба Соединительная С Краном - 155.02.12.Сб-1. 8-Труба Подогревателя - 166.02.26Сб. 9 - Труба Подогревателя - 165.02.13Сб-1А. - 3 Pieces. 10.-Труба Подогревателя- 165.02.14Сб-2. 11- Трубка (Масло+Вода) От Масляного Бака К Водяному Насосу. 12. Трубка (Масло+Вода) От Крана К Мзн. 13- Tube From Mzn. 14- Heater Pipe. 15-Труба От Клапана Слива Воды. 16- Трубка От Поддона Двигателя. The Warranty Period For The Operation Of The Equipment Is 12 Months From The Date Of Commissioning., Set Of Pipelines For The Cooling System Of The T-62 Tank Requirements For Metal Pipes: Materials (Steel 20, 30Khgsa, Aluminum Alloys) Must Have: - Have High Fatigue Strength; - Be Resistant To Internal Corrosion; - Withstand Temperature Changes; - Be Well Welded And Machined; - Have Sufficient Rigidity Of Shape. Main Parameters Of Pipes: Diameter (Internal) 8-57 Mm Wall Thickness 1-3Mm Operating Temperature Up To 135°C Pressure (Max.) 0.8 Mpa Requirements For Flexible Pipelines (Sleeves): Rubber-Fabric Materials Must: - Be Oil And Fuel Resistant; - Maintain Elasticity At Low Temperatures (Up To −40 °C); - Withstand Elevated Temperatures Without Destruction; - Have Reinforcement (Fabric Or Metal) For Strength; - Be Resistant To Cracking And Aging. Operating Conditions. Ambient Temperature: From -40°C To +50°C Coolant Temperature: Up To 115°C Pressure: - Cooling System: Up To 0.03–0.5 Mpa Impacts: - Vibration; - Dust, Dirt; - Possible Ingress Of Fuel And Oils Types Of Connections: - Fittings According To Gost; - Union Nuts; - Seal; - Cone-Cone; - Copper Rings. Control And Testing. Pressure Testing: 1.25–1.5 Of The Working Pressure, Tightness Control. Contents: 1. Pipe From Pump 54.02.120Sb-A. 2. Water Drain Valve - 166.02.27Sb. 3. Pipe - 54.02.107Sb-A. 4. Pipe From The Engine To The Coil - 155.02.115Sb-1B. 5.Pipe-155.02.125Sb-A. 6. Pipe From The Water Pump - 02.54.45.Sb-7B. 7. Outlet Pipe - 54.02.130Sb-A. 8. Connecting Pipe With Tap - 155.02.12Sb-1. 9. Heater Pipe - 166.02.26Sb. 10.Tube-155.02.116Sb. 11. Tube - 54.02.123Sb. 12. Heater Pipe - 165.02.13Sb-1A. 13. Heater Pipe - 165.02.14Sb-2. 14. Tube (Double Oil + Water) From The Oil Tank To The Water Pump. 15. Tube From Mzn. 16. Tube (Double Oil + Water) From The Tap To The Mzn. 17. Connecting Tube Of Engine Heads. The Warranty Period Is 12 Months From The Date Of Commissioning.
Key Value
Tender Value
15,824,592 - KZT
Tender Documents
Global Tender Document
598df9cb-9d8d-4b27-b4fb-4bd1dcdbcf6b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.