Tenders Are Invited For Lunar Night Pcdu

Tender Detail

114980447
1-13551
Self-Funded
Tenders Are Invited For Lunar Night Pcdu
NCB
Western Europe
European Union
21-08-2026

Work Detail

Tenders Are Invited For Lunar Night Pcdu - Expro+ Objective: To Develop And Implement A "Hibernation Mode" Function For Pcdus Reducing The Current Sunk From The Battery And Implement A "Low Power Consumption Mode".Description: Power Control And Distribution Unit (Pcdu) Is Always Connected To A Battery And Energy Sources (E.G. Solar Panel) In Order To Keep The Power Bus Available At All Conditions. Because Of This, There Is Always A Non-Negligible Pcdu Internal Consumption From The Batteries. However, There Are Some Very Specific Cases Where The Power Should Be Reduced To A Minimum In A Controlled Manner (E.G. To Survive Long Lunar Nights With A Limited Energy Stored On The Batteries). This Activityaims To Develop A Pcdu Hibernation Mode, So That The Pcdu Can Enter Into An Extremely Low Consumption Mode (E.G. Below 7.5Ma) In A Reliable Manner And Can Come Back To Nominal Operations After A Command Is Sent Or Via A Watchdog Signal. In Addition To The Hibernation Mode, This Activity Develops A "Low Power Consumption Control" Mode, Where The Loads To Be Supplied During Low Energy Consumption Mode Are To Be Identified And Supplied According To The Needs And The Energy Available (E.G. Heaters For Lunar Night Survival). Implementation Of Hibernation Mode For Pcdus Is Targeted To Include The Aspects Such As I.E. Wake-Up Mechanism, Watchdogs, Low Stand-By Consumption Technologies. Meanwhile, "Low Power Consumption Mode" Entails The Development Of Control Algorithms And Low Consumption Hardware To Provide Power To Dedicated Loads According To The Energy Available. The Activity Encompasses The Following Tasks: - Consolidation Of The Preliminary Requirements Of The Low Power Consumption And Hibernation Modes Taking Into Account Future Exploration Missions Needs. - Trade-Off Potential Designs (Best Topologies, Control Logic, Switching Devices...) And Select A Baseline. - Design Of The Baseline, Including The Design Analysis - Prototype Manufacturing - Testing Of The Prototype - Analyze Test Results, Identify Deviations And Implement Corrections If Any On The Prototype.Deliverables: Breadboard, Reportprocurement Policy: C(1) = Activity Restricted To Non-Prime Contractors (Incl. Smes). For Additional Information Please Go To:Http://Www.Esa.Int/About_Us/Business_With_Esa/Small_And_Medium_Sized_Enterprises/Opportunities_For_Smes/Procurement_Policy_On_Fair_Access_For_Smes_-_The_C1-C4_Clauses Read Less Tender Link : Https://Esastar-Publication-Ext.Sso.Esa.Int/Esatenderactions/Filter/Open

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document e4e1849f-0523-485e-a5f9-d0e2a0584e17.htm
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp