GTR 114966774
Tenders Are Invited For Construction-Site Supervision Services - Preparation Of A Report For The Assessment Of The Compliance Of An Investment Project (Osip) And The Exercise Of Construction Supervision During The Implementation Of The Smr Of A Site: Reconstruction And Construction Of Water Supply Networks And Rehabilitation Of Kiril I Metodii Street From Pt 833 To Pt 860, Town Of Berkovitsa, Municipality Of Berkovitsa
ICB — International Competitive Bid
Closes Jul 20, 2026
Eastern Europe
Tender Information
GTR Reference
114966774
Tendering Authority
Subscribe to view
Tender No
428281-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction-Site Supervision Services - Preparation Of A Report For The Assessment Of The Compliance Of An Investment Project (Osip) And The Exercise Of Construction Supervision During The Implementation Of The Smr Of A Site: Reconstruction And Construction Of Water Supply Networks And Rehabilitation Of Kiril I Metodii Street From Pt 833 To Pt 860, Town Of Berkovitsa, Municipality Of Berkovitsa
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
20-07-2026
Work Detail
Construction-Site Supervision Services - Preparation Of A Report For The Assessment Of The Compliance Of An Investment Project (Osip) And The Exercise Of Construction Supervision During The Implementation Of The Smr Of A Site: Reconstruction And Construction Of Water Supply Networks And Rehabilitation Of Kiril I Metodii Street From Pt 833 To Pt 860, Town Of Berkovitsa, Municipality Of Berkovitsa. The Following Types Of Activities Are Included In The Scope Of The Public Procurement: Carrying Out Technical Control During The Design And Carrying Out An Assessment Of The Compliance Of An Investment Project With The Essential Requirements For Constructions According To Art. 142, Para. 5, Para. 6, Item 2, Para. 10 And Para. 11 In Connection With Art. 142, Para. 4 Of The Zut. Preparation Of A Complex Report For The Assessment Of The Compliance Of An Investment Project In Accordance With The Ll. All Parts Of The Investment Project, Which Are Grounds For Issuing A Construction Permit, Are Evaluated For Their Compliance With The Basic Requirements For Construction. The Scope Of The Activities For The Preparation Of The Complex Report For The Assessment Of The Compliance Of The Complex Project For An Investment Initiative With The Essential Requirements For Constructions Includes Checking For Compliance With: - The Provisions Of The Detailed Development Plan; - The Rules And Regulations For The Organization Of The Territory; - The Requirements Under Art. 169 Of The Zut; - The Mutual Coherence Between The Parts Of The Project; - Completeness And Structural Compliance Of Engineering Calculations; - Other Specific Requirements For Certain Types Of Construction According To A Regulatory Act, If There Are Any For The Site; - The Requirements Of Administrative Acts That Have Entered Into Force, Which, Depending On The Type And Size Of The Construction, Are A Necessary Condition For Permitting Construction Under The Environmental Protection Act, The Biological Diversity Act, The Cultural Heritage Act Or Another Special Law, As Well As Reflecting The Measures And Conditions Of These Acts In The Project; All Documents (Graphical And Textual) Of The Complex Report Are Signed And Stamped By The Manager Of The Executor Of This Order Or The Official Representative In The Absence Of A Management Body. Exercise Of Construction Supervision During Construction, According To Art. 166 Of The Law On Territorial Planning (Zut). The Scope Of Construction Supervision Activities During Construction Is According To Art. 168 Of The Zut, Including Coordination Of The Construction Process Until The Site Is Put Into Operation; Performing The Function Of Safety And Health Coordinator, According To Ordinance No. 2 Of 22.03.2004 R. For The Minimum Requirements For Health And Safety Working Conditions In The Execution Of Construction And Assembly Works; Preparation Of A Final Report Under Art. 168, Para. 6 Of The Zut; Preparation And Registration Of A Technical Passport According To Art. 176A Of The Zut And Ordinance No. 5 Of December 28, 2006 For Technical Passports Of Constructions. Submission Of The Necessary Documents For The Appointment Of A Reception Committee. Note: For The Site Reconstruction And Construction Of Water Supply Networks And Rehabilitation Of Kiril And Metodiy St. From Pt 833 To Pt 860, Berkovitsa Town, Berkovitsa Municipality The Investment Project Is A Complex Project For An Investment Initiative And The Preparation Of A Complex Report For Assessing The Compliance Of The Investment Project Is In Accordance With Article 150 Of The Zut. Full Information About The Scope, Volume And Requirements For The Implemented
Key Value
Tender Value
27,500 - BGN
Tender Documents
Global Tender Document
f4314470-f68d-4449-be72-7c50ac073b81.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.