Engineering Design Services – Study Of A New Layout Of Arkalochori - Zinda Road. The Object Of The Study Is The Preparation Of The Necessary Studies For The Construction Of The Road That Will Connect The Arkalochori Junction Of The Heraklion - Viannos Road With The Zinda Settlement With The Construction Of The Required Junctions. The Estimated Value Of The Contract Amounts To €224,907.54 (Without Vat) And Includes The Estimated Fees Of The Following Individual Categories Of Studies: 1) €59,538.87 For Category 10 Study - Transportation Studies (With Tender Documents) 2) €38,146.54 For Category 16 Study - Topographic Studies 3) €27,978.95 For Category 20 Study – Geological Studies 4) €32,548.86 For Category 21 Study – Geotechnical Studies And Surveys 5) €17,223.79 For Category 13 Study – Hydraulic Studies (With Tender Documents) 6) €10,504.20 For Category 27 Study – Environmental Studies 7) €6,019.89 For Category 9 Study – Electromechanical Studies (With Tender Documents) 8) Saf-Fau €3,610.67 And €29,335.77 For Unforeseen Expenses
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.