GTR 114929100

Tenders Are Invited For Fire-Alarm System Installation Work - Design, Construction And Authors Supervision Of A System For Fire Alarm, Emergency And Evacuation Lighting In Educational Block No. 7 - Hall No. 3,4,5,6,7,8,9 And 10 Of Technical University - Sofia

ICB — International Competitive Bid Closes Jul 30, 2026 Eastern Europe
Tender Information
GTR Reference
114929100
Tendering Authority
Subscribe to view
Tender No
441175-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Fire-Alarm System Installation Work - Design, Construction And Authors Supervision Of A System For Fire Alarm, Emergency And Evacuation Lighting In Educational Block No. 7 - Hall No. 3,4,5,6,7,8,9 And 10 Of Technical University - Sofia
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
30-07-2026
Work Detail
Fire-Alarm System Installation Work - Design, Construction And Authors Supervision Of A System For Fire Alarm, Emergency And Evacuation Lighting In Educational Block No. 7 - Hall No. 3,4,5,6,7,8,9 And 10 Of Technical University - Sofia. Block #7 Is A Free-Standing One-Story Building Without A Basement With A Built-Up Area Of ​​7,560.00 Sq.M. And The Expanded Built-Up Area 7,560.00 Sq.M. The Object Is Divided Into 12 Halls Which Are Intended For Research And Production Activities With Independent Exits Directly Outside. The Subject Of This Order Are Halls No. 3, 4, 5, 6, 7, 8, 9 And 10 Of Block No. 7 Of The Technical University - Sofia. The Building Has Functional Fire Hazard Class F5 (F5.1/F5.2). The Supporting Structure Is Prefabricated Metal-Tubular, And The Roof Structure Is Metal Markhi Type. The Building Is Ιιιth Category. The Contract Enters Into Force From The Date Of Its Registration In The Records Of The Contracting Authority. The Individual Types Of Activities Should Be Completed Within The Following Terms: Up To 140 (One Hundred And Forty) Calendar Days, Counted From The Date Of Registration Of The Contract In The Contracting Authoritys Record-Keeping System And Is Distributed As Follows: Time Frame For Filming, Preparation Of An Investment Project In The Technical Project Phase In All Parts (Including Estimated Quantitative Accounts): A Minimum Of 30 (Thirty) And A Maximum Of 60 (Sixty) Calendar Days, With The Term Starting From The Date Of Conclusion Of The Contract And Ends With The Acceptance Of The Project By The Contracting Authority With A Bilaterally Signed Acceptance-Handover Protocol. The Project Is Handed Over To The Contracting Authority, For Which A Bilateral Acceptance-Handover Protocol Is Signed. Within 10 Days Of Signing The Protocol, The Employer May Make Written Objections To The Project And Invite The Contractor To Jointly Consider The Remarks (Irregularities). The Contractor Should Remove Remarks/Irregularities On The Submitted Technical Project Within 5 (Five) Calendar Days, After Receiving Them In Writing. After The Contractor Removes The Remarks/Irregularities, A Bilateral Final Acceptance-Handover Protocol For The Presented Project Is Signed. After Approval Of The Project By The Contracting Authority Within 5 (Five) Calendar Days, All Quantity Accounts For The Individual Project Parts Of The Approved Project Shall Be Combined Into A General Detailed Quantity-Value Account, Which Shall Be Handed Over To The Contracting Authority And An Acceptance-Handover Protocol Shall Be Signed. The Items In The General Bill Of Quantities Must Fully Correspond To The Items From The Bill Of Quantities For The Designed Parts. The Prepared Project Is Approved By The Territorial Office Pbzn. The Design Activities Are Considered Completed After Agreement And Seal By The Territorial Office Pbzn And Acceptance Of The Designs By The Contracting Authority Without Comments. The Term For The Coordination And Approval Of The Project Is Not Included In The Design Term. The Term For Exercising Authors Supervision Is Until The Completion Of The Construction With The Signing Of The Necessary Acts Established By Law For Its Completion. The Term For Construction Execution (Term For Execution Of The Agreed Construction And Assembly Works, Including Installation And Configuration Of All System Components And 72-Hour Samples) Is: Minimum 30 (Thirty
Key Value
Tender Value
58,990 - BGN
Tender Documents
Global Tender Document
ec82e761-cd8c-408c-a2e4-a3157f73f76a.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders