1. The Subject Of The Order Are Construction Works Consisting In The Renovation Of A Building Located In Kalisz At Ul. Fabryczna 13-15 (Plot No. 6/8 And 7/4 Within The Geodetic Area 035 Śródmieście Ii), Based On The Documents Specified In Point 4.5 Of Swz.2. The Material Scope Covered By These Proceedings Includes Construction Works Related To The Renovation Of Rooms Located In The Basement Of The Building And Includes In Particular: 1) Demolition And Dismantling Works; 2) Construction Of Partition Walls From Plasterboards; 3) Execution Of Mechanical Ventilation; 4) Replacement Of Cut-Off Flaps Of Ventilation Ducts; 5) Repair, Cleaning And Painting Of Steel And Steel/Concrete Doors; 6) Replacement Of Internal Doors; 7) Construction Of Technical Doors Of The Duct Ventilation;8) Replacing The Emergency Grate;9) Covering Floors And Walls With Stoneware Tiles;10) Cleaning And Covering Concrete And Stoneware Floors With Epoxy Resin;11) Installing New Floors In Rooms;12) Cleaning Walls And Ceilings From Old Paint Coatings;13) Chipping Away And Repairing Damaged Plaster;14) Painting Walls And Ceilings With Emulsion Paint;15) Cleaning And Unblocking Ventilation Ducts;16) Delivery And Installation Of A Stair Climber;17) Delivery And Installation Of Fire Extinguishers;18) Delivery And Installation Of Benches;19) Execution Of Electrical And Lighting Installations;20) Execution Of Sanitary, Water, Sewage And Central Heating Installations;21) Other Accompanying Works Necessary For The Proper Execution Of The Order. Note: Due To The Fact That The Building Is In Constant Use And Will Remain So For The Duration Of The Works, As Well As Due To The Specificity Of The Facility (The Works Will Be Carried Out In A Facility Located Under The School Building), Before The Commencement Of The Works, The Method And Sequence Of Their Implementation Should Be Agreed With The User Of The Facility. Robots Cannot Disrupt The Operation Of The Facility. The Contractor Is Obliged To Conduct Them In Such A Way As To Ensure The Proper Functioning Of The Facility, With Particular Emphasis On The Nature Of The Facility And The Safety Of Students Attending The School. +/- 5% Tolerance Is Allowed In Terms Of The Dimensions Of The Desks (Length, Height, Width), Specified In The Design Documentation Indicated In Point 4.5. Swz. The Subject Of The Order Is Implemented Under The Civil Protection And Civil Defense Program For 2025 - 2026 - Area I. Since The Procedure In Question Was Covered By External Co-Financing, Taking Into Account The Above, The Ordering Party Reserves The Right To Verify The Progress Of Works On The Construction Site Not Only By The Ordering Partys Employees And Properly Authorized Investor Supervision Inspectors, But Also By Third Parties (Authorized Under The Contract On Co-Financing Of The Order). The Contractor, On His Own And At His Own Expense, Will Provide The Necessary Utilities (Including Water, Electricity) To Operate The Construction Site For The Duration O
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.