1. The Subject Of The Order Are Construction Works Consisting In Improving The Energy Efficiency Of The Facility Of The School And Kindergarten Complex No. 1 In Rawicz, Carried Out As Part Of The Budget Task Entitled: Improving The Energy Efficiency Of Schools And Kindergartens In The Rawicz Commune.2. The Scope Of Work During The Execution Of The Order Includes The Execution Of All Construction Works In Accordance With The Attached Design Documentation, Bills Of Quantities Together With Zero Cost Estimates, Provisions Included In The Swz With Annexes And Applicable Regulations, In Particular: 1) Insulating The Attic With Mineral Wool, 2) Laying Floors With Osb Boards, 3) Insulating The Flat Roof Of The Connector With Mineral Wool, 4) Renovation Of Historic Door Joinery, 5) Installation Of Electrical Wiring Air Curtains Above The Doors,6) Replacement Of Radiators With New Ones, 7) Installation Of Automatic Thermostatic Heads Controlled Remotely,8) Comprehensive Replacement Of The Central Heating Installation With A New One,9) Installation Of Ground-Source Heat Pumps With A Heat Exchanger,10) Replacement Of Hot Water Heaters With New Ones,11) Comprehensive Replacement Of Lighting With Led,12) Replacement Of External Metal Door Joinery,13) Insulation Of Basement Walls,14) Tiling Works,15) Installation Of Ceilings Cassettes,16) Insulation Of Foundations,17) Construction Of New Floors On The Ground,18) Masonry Works,19) Locksmith Works,20) Roofing And Roofing Works,21) Execution Of Sheet Metal Work,22) Dismantling And Installation Of New Gutters And Downpipes,23) Strengthening The Roof Structure,24) Securing The Roof Truss To The Nro Class,25) Installing A Roof Over The Door,26) Carrying Out Replacement Floors On The Ground Floor With New Insulation,27) Repainting The Walls Of All Rooms In The School,28) Replacement Of Floor Coverings,29) Delivery And Installation Of A Photovoltaic Installation Along With All Necessary Notifications, Accompanying Works And The Possibility Of Remote Reading,30) Installation Of A Lightning Protection System,31) Installation Of General, Emergency And Evacuation Lighting,32) New Installation Of Plug Sockets,33) Intercom Installation,34) Power Supply For Industry Devices Existing Electrical Connections,35) Construction Of New Cables, Routes And Number Of Points,36) Replacement Of Switchgears,37) Installation Of A Fire Protection Switch,38) Comprehensive Painting Works After Thermal Modernization, Electrical And Central Heating Works,39) Maintenance And Servicing Of Devices During The Warranty Period,40) Verification And Optimization Of Devices During The Warranty Period In Order To Minimize Operating Costs (Mandatory: After A Month And A Year Of Operation Of The Facility; Further Ones As Indicated The Ordering Party),41) Other Works Accompanying The Proper Execution Of The Works, Including Primarily The Removal And Disposal Of Rubble And Cleaning Works.