GTR 114905871

Tenders Are Invited For Installation Of Double-Sided Photovoltaic Panels (Bifacial) With A Capacity Of 40 Kw Per O. Sewage Treatment Plant In Dobiegniew As Part Of Improving The Energy Efficiency Of Public Utility Facilities (...)

ICB — International Competitive Bid Closes Jul 10, 2026 — 2 days left central europe
Tender Information
GTR Reference
114905871
Tendering Authority
Subscribe to view
Tender No
KG.271.10.2026.ES
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Installation Of Double-Sided Photovoltaic Panels (Bifacial) With A Capacity Of 40 Kw Per O. Sewage Treatment Plant In Dobiegniew As Part Of Improving The Energy Efficiency Of Public Utility Facilities (...)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
10-07-2026 2 days left
Work Detail
The Subject Of The Order Is The Construction Of A Photovoltaic Installation With A Capacity Of Up To 40 Kw Located On Plot No. 408/5 In Dobiegniew, Commune. Dobiegniew. The Subject Of The Order Covers The Full Scope Of Work Covered By Technical Documentation, Including: 1. Preparatory And Surveying Works (Setting Out The Lines Of Tables).2. Installation Of The Supporting Structure (Driven Into The Ground).3. Installation Of Photovoltaic Modules.4. Laying Dc And Ac Cable Installations (Including Earthworks).5. Installation And Connection Of Electrical Switchboards (Ac And Dc) And Inverter.6. Execution Of Earthing And Equalizing Installation.7. Conducting Tests, Electrical Measurements And Commissioning Of The Installation. Within The Period Of Execution Of The Contract, The Contractor Is Obliged To: A) Commission The Installation; B) Perform Tests, Tests And Start-Ups Of The Photovoltaic Installation, C) Perform Measurements Of The Effectiveness Of Anti-Shock Protection And Grounding Effectiveness - After Completing The Installation Of The Photovoltaic Installation, D) The Contractor Is Obliged To Provide The Investor With: - A Single-Line Electrical Diagram Of The Installation (Signed By An Installer With Authorizations Certified By Udt Or Sep D+E). - Protocols On Electrical Measurements Along With A Copy Of The Qualifications Of The Measuring Person. - Warranty Cards, Ce Declarations And Device Operating Instructions In Polish. - Confirmation Of Reporting The Installation To The Distribution System Operator (Dso) And Obtaining Acceptance Of The Submitted Documents Without Comments, - Preparing A Notification To The State Fire Service Authorities About The Completion Of The Photovoltaic Installation And The Planned Commencement Of Its Use, - Complete As-Built Documentation, Including Surveying.2. The Contractor Is Obliged To Provide Construction And Works Management In Accordance With The Work Sectors Required By Law (If Applicable). A Detailed Description Of The Subject Of The Order Is Specified In The Design Documentation And The Technical Specification For The Execution And Acceptance Of Construction Works. This Documentation Is An Annex To The Swz And Is Available On The Website Of The Proceedings As Annex No. 6.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6ec18345-da3c-41ba-9f5d-cdf1a60cf3d9.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders