Part I Modernization Of The Village Community Center In Kotorów Description Of The Subject Of The Order: The Subject Of The Order Are Construction Works On The Existing Building Of The Community Center In Kotorów. Within The Scope Of The Order, The Planned Works Include, Among Others: 1) Replacement Of The Wooden Roof Structure And Roof Covering Along With Laths, Counter-Battens And Insulation, Sheet Metal Flashings, Gutters, Lightning Protection Installation; 2) Other Works Are Of A Finishing Nature And Include The Construction Of Suspended Ceilings, Plastering And Painting Works And The Reconstruction Of Lighting In The Ground Floor Rooms, Internal Electrical And Grounding Installation Fire Protection Power Switch..3) Cleaning Works, Cleaning Up The Work Area. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 2 To The Swz Technical Documentation - Part I Technical Documentation Of Kotorów Community Center. The Employers Requirements Regarding The Implementation Of Part I Of The Task And The Equivalence Of The Subject Of The Order: 1) The Contractor Must Foresee All Circumstances That May Affect The Price Of The Order. Due To The Above, Bidders Are Required To Check The Terms And Conditions Of The Contract Very Carefully, Including The Use Of An On-Site Inspection, Before Submitting Offers. Construction Works Must Be Performed In Accordance With Applicable Standards, Construction Practice, Occupational Health And Safety And Fire Protection Regulations. And The Instructions Of The Investors Supervision Inspector.2) In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. Where References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In Design Documentation. The Ordering Party Allows Equivalent Solutions. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Design Documentation Or Technical Specification For The Execution And Acceptance Of Works, It Means That They Are Provided As Examples And Define Only The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Use Equivalent Materials Or Devices, But With Similar Or Better Technical And Quality Parameters, The Use Of Which Will In No Way Adversely Affect The Proper Functioning Of The Solutions Adopted In The Design Documentation. The Contractor Who Uses Equivalent Devices Or Materials Will Be Obliged To Demonstrate During The Execution Of The Order That The Devices And Materials Used By Him Meet The Requirements Specified By The Ordering Party. The Use Of A Label In The Design Documentation Mean
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.