GTR 114905840
Tenders Are Invited For Renovation Of District Road No. 1146D On The Section Between Buczyna And Strogoborzyce
ICB — International Competitive Bid
Closes Jul 10, 2026
central europe
Tender Information
GTR Reference
114905840
Tendering Authority
Subscribe to view
Tender No
PZDP.254.9.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of District Road No. 1146D On The Section Between Buczyna And Strogoborzyce
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
10-07-2026
Work Detail
1. The Subject Of The Order Is The Renovation Of District Road No. 1146D On The Section Between The Towns Of Buczyna And Strogoborzyce, From Km 0+120 To Km 1+000, Carried Out As Part Of The Task Titled: Buczyna Access Road To Agricultural Land.2. Subject Of The Order, As In Section 1 Includes In Particular Renovation: A. Road Surface By: - Corrective (Profile) Milling - Execution Of A 6 Cm Thick Ac11s Wearing Course Along With Sprinkling With Asphalt Emulsion - Approx. 4,000 M2, B. Bay Surface: - Construction Of A Reinforcing Layer Of Sand Stabilized With C1.5/2Mpa Cement, 20 Cm Thick After Compaction, Including Troughing - Approx. 50 M2, Construction Of A Surface Made Of Trylinka Cubes (Material Provided By The Ordering Party, The Contractor Independently Loads And Transports The Cubes From The Ordering Partys Technical Base Located In Przemków To The Construction Site - Approx. 10 Km), C. Slopes (10 Pcs.) By: - Making A Reinforcing Layer Of Sand Stabilized With C1.5/2Mpa Cement, 15 Cm Thick After Compaction, Including Troughing - Approx. 250 M2, - Making A Foundation Layer Of Unbound Mixture C90/3, Grain Size 0/31, Thickness After Compacting 20 Cm (Staggering Of Layers At The Edge) With Troughing - Approx. 250 M2, - Ac11s Wearing Course, 4 Cm Thick After Compaction, Including Sprinkling With Asphalt Emulsion - Approx. 250 M2, D. Passing Walls (3 Pcs.) By: - Making A Reinforcing Layer Of Sand Stabilized With C1.5/2Mpa Cement, 15 Cm Thick After Compaction, Including Troughing - Approx. 90 M2, - Making A Foundation Layer Of Unbound C90/3 Mixture With A Grain Size Of 0/31, Thickness After Compacting 20 Cm (Stepping The Layers At The Edge), Including Troughing - Approx. 90 M2, - Ac11so Wearing Course, Thick After Compacting, 4 Cm, Including Sprinkling With Asphalt Emulsion - Approx. 90 M2,E. Shoulders With A Width Of: 1 M - Right-Side Shoulder, 1.5 M - Left-Side Shoulder, By: - Troughing To A Depth Of 20 Cm - Approx. 2,200 M2, - Making A Layer Of Crushed Aggregate With Continuous Grain Size 0/31.5 (C90/3), Mechanically Stabilized (Laid With A Paver), With A Layer Thickness Of 20 Cm Including Sprinkling Asphalt Emulsion – Approx. 2,200 M2, F. Restoration Of Permanent Traffic Organization (P-7C – 880 M, P-7D – 880 M, P-17 – 2 Pcs.).3. The Scope Of Works Covered By The Subject Of The Order Concerns The Performance Of All Works Related To The Modernization Of The Surface, Including The Performance Of Any Additional Works, In Particular Cleaning The Surface, Sprinkling The Surface With Emulsion, Performing Profiling Milling, And Implementing A Profiling And Leveling Subgrade Layer, If Such Works Are Necessary To Be Performed.4. Area Covered By Construction Works: District Road No. 1146D, Plots With Registration Numbers: Plots With Registration Numbers: 301, 17 District 0001 Buczyna, Registration Unit 021606_2 Radwanice.5. Before Commencing Construction Works, The Contractor Should Develop, Approve And Implement A Temporary Traffic Organization Design,
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
9163ba0e-0bd9-4f39-b0d2-dc01d52729f9.html
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.