1. The Subject Of The Order Is The Reconstruction Of District Road No. 1008C In The Town Of Rzepiczna, Consisting Of The Construction Of A Pedestrian Road, Reconstruction Of Exits And Construction Of Drainage - Stage I.2. The Scope Of Works Includes In Particular 1) Reconstruction Of The Road Route, 2) Cutting Of Greenery And Replacement Plantings, 3) Demolition Works, 4) Earthworks, 5) Protection Of Power Cables, 6) Construction Of The Substructure, 7) Construction Of A Pedestrian Road, 8) Reconstruction Of Exits, 9) Road Safety Elements, 10) Rainwater Drainage. 3. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Constituting Annex No. 4 To The Swz, The Bill Of Quantities Constituting Annex No. 5 To The Swz, As Well As In The Technical Specifications For The Execution And Acceptance Of Construction Works, Constituting Annex No. 6 To The Swz.4. The Construction Works Covered By This Announcement Will Be Performed Based On The Notification Of Construction Works Not Requiring A Building Permit To The Public Administration Body (Certificate No. Bd.6743.6.2.2025.Ecz Of January 20, 2025).5. The Contractor, Without Additional Remuneration, Undertakes To: 1) Perform All Preparatory Works, Including Cleaning Works, Organization And Maintenance Of The Construction Site, Provide An Energy Connection For The Needs Of The Construction Site And Bear The Costs Of Their Consumption, 2) Mark And Secure The Construction Site, 3) Bear All Costs Of Research, Expert Opinions And Opinions Necessary To Assess The Quality Of The Works And Proper Performance Of The Subject Of The Order, 4) Bear The Costs Related To The Acceptance Of The Completed Works, 5) Prepare A Traffic Management Project For The Duration Of The Works Before Entering The Construction Site,6) In The Event Of Damage To Equipment Or Parts Thereof (Including Water And Sewage Networks, Electricity, Electrical Engineering, Drainage Devices And Municipal Roads) During The Execution Of The Subject Of The Order - Repairing Them And Restoring Them To Their Original Condition,7) Covering The Costs Of Possible Compensation For Entering The Land And Destroying Crops,8) Covering Possible Costs Of Dismantling, Assembling Or Repairing Property Fences And Other Damage To Existing Facilities And Development Elements Area,9) Covering The Costs Of Restoring Road Surfaces,10) Carrying Out Surveys, Tests, Etc., As Well As Making Uncovered Works In The Event Of Failure To Report Works That Are Covered Or Disappearing For Acceptance,11) Ensuring Supervision As Well As Appropriate Occupational Health And Safety Conditions,12) Ensuring And Covering The Costs Of Surveying Services, Including The Preparation Of A Surveying Inventory In 2 Copies, 13) Keeping The Construction Site Free From Traffic Obstacles And Removing Them On An Ongoing Basis Unnecessary Materials, Waste And Garbage, 14) Tidy Up The Construction Site After The Completion Of The Works And Hand It Over To The Ordering P