The Planned Expansion Of The Building Of The Educational Facilities Complex Is Designed In The Southern Part Of The Plot, Directly Next To The Southern Gable Wall Of The Existing Building. A 2-Story, No-Basement, Separate Part Will Be Added To The Main Body Of The Existing School Building, Housing Rooms For Educational Activities, Therapeutic Offices And Relaxation Rooms. An Additional Entrance To The New Part Was Designed From The North, From The Sidewalk From Ul. Mazowiecka. The Building Will Also Have Direct Access To The Terrace From The Pitch Side. The Building Will Be Adapted To The Needs Of People With Disabilities, So That Children/Young People Can Move Around Independently. Vertical Circulation In The Added Part Will Be Provided By A New Open Staircase And A Lift For Disabled People. On Both Levels, The Halls In The Added Part Will Be Connected To The Corridors In The Existing School Building, Which Will Improve Communication And Evacuation Conditions. The Newly Created Wing Will Provide Opportunities For Childrens Development And Education In A Building That Ensures Appropriate Standards And Conditions For The Educational Development Of Students With Disabilities. In The Existing Building, The Existing Bathroom On The First Floor Was Also Designed To Be Adapted To The Needs Of Disabled People. As Part Of The Investment, The First Stage Of The Investment Was Completed, Including: 1) Disassembly Of Elements Interfering With The Ongoing Construction. 2) Foundation With Thermal Insulation Of The Foundation Walls. 3) Backfill Of The Foundation With A Slab On The Ground. 4) Reinforced Concrete Stairs. 5) Reinforced Concrete Slab For The Lift. 6) Load-Bearing Walls Of The Ground Floor And First Floor. 7) Ground Floor Ceiling. And Security Works In The Scope Of: 1) Reinforced Concrete Ring Beam And Floors.2) Reinforcement Of Reinforced Concrete Ring Beams And Joists.3) Reinforced Concrete Ceiling Above The First Floor.4) Reinforcement Of Ceilings.5) Reinforced Concrete Parapet.6) Reinforcement Of Parapet.7) Covering Of External Openings On The Ground Floor.8) Cleaning Works In The Area Of The Expanded Facility. As Part Of This The Second Stage Of The Procedure Will Be Carried Out, Including Construction Works: 1) Waterproofing Of The Floor. 2) Thermal Insulation Of The Floor. 3) External Walls - Thermal Insulation. 4) Internal Walls - Double Plasterboard. 5) Thermal Insulation - Of The Flat Roof. 6) Flashing Of Attics And Chimneys. 7) Waterproofing - Of The Flat Roof. 8) Joinery - Windows, Doors, Glazing.9) Floors On Floor.10) Floors On The Ground Floor.11) Suspended Ceiling.12) Plastering.13) Plastering.14) Painting.15) Stair Finishing (Stoneware).16) Doors And Railings For Stairs.17) Adaptation Of A Bathroom For Disabled People In An Existing Building.18) Separation Of A Fire Protection Zone On The First Floor In An Existing Building According To The Indications In The Project.19) Adaptation Of Utility Rooms In An Existing Building In Order T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.