1. The Subject Of The Order Is The Modernization Of Former Farm Buildings In Wiry In The Design And Build Formula Based On The Functional And Utility Program (Hereinafter Referred To As Ffu) And The Detailed Description Of The Subject Of The Order (Hereinafter Referred To As Opz). The Modernization Will Consist In The Expansion (Construction Of A Connector) And Reconstruction Of The Existing Granary And Forge Buildings, Along With Changing The Way They Are Used For Cultural And Educational Purposes. After Modernization, The Facility As A Whole Will Fulfill Cultural And Educational Functions For The Local Community (Cultural Center). 2. The Planned Investment Is Located Within The Plot No. 730/10 In The Village Of Wiry, Komorniki Commune, At Ul. Zespółowa 23. The Existing Farm Buildings, I.E. The Former Granary And Forge, Are Entered Into The Municipal Register Of Monuments And Are Currently Secured And Unused. Within The Investment (Plot No. 730/10) There Is And Is Currently A Primary School Building With A Gymnasium And Accompanying Infrastructure.3. The Contractor Is Responsible For Ensuring That The Works Are Carried Out In Such A Way That Their Scope Does Not Disturb The Functioning Of Neighboring Buildings And Guarantees The Safety Of Bystanders, Including Users Of The Building Of The Primary School. Greater Poland Insurgents In Wiry.4. The Detailed Scope Of Work, According To Which The Work Should Be Performed, Is Included In The Functional And Utility Program Constituting Annex No. 9 To This Swz And The Detailed Description Of The Subject Of The Order Constituting Annex No. 10 To This Swz.5. On-Site Visitthe Ordering Party Provides For The Contractors Obligation To Carry Out An On-Site Visit To Check The Conditions Related To The Performance Of The Works That Are The Subject Of The Order. The Costs Of Site Inspection Are Borne By The Contractor. The Site Inspection Will Take Place On June 29, 2026. Performers Meeting At 12.00 In Front Of The Primary School Building. Powstańców Wielkopolskich In Wiry, Ul. Zespółowa 23. Contractors Must Be Equipped With Appropriate Occupational Health And Safety Footwear And Protective Helmets And Have Authorization/Power Of Attorney To Represent The Contractor (If The Authorization Does Not Result From The Registration Documents). The Contractors Representatives Will Be Obliged To Sign A Report On The On-Site Visit, In Accordance With Annex No. 11 To The Swz. Pursuant To Art. 226 Section 1 Point 18 Of The Public Procurement Law, An Offer Submitted Without An On-Site Visit Will Be Rejected. Contact Persons: Investment And Renovation Department, Tel. 061 8100668 Or 512 716 241.6. The Contractor Is Obliged To Prepare As-Built Documentation In Two Copies In A Paper Version And In An Electronic Version On A Pendrive And Submit It To The Ordering Party.7. A Detailed Description Of The Conditions For The Implementation Of The Subject Of The Order Is Included In The Draft Provisions Of The Contract Constituting Ann
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.