Partial Task No. 1: Improving The Energy Efficiency In The Building Of The Village Community Center In Klęcin. The Subject Of The Investment Is To Improve The Energy Efficiency Of The Building Of The Village Community Center Located In The Town Of Klęcin, On Plots No. 256 And No. 257 In The Town Of Klęcin 22, Commune. Główczyce. The Aim Of The Planned Investment Is To Improve The Energy Efficiency Of The Facility, Reduce Operating Costs And Reduce Pollutant Emissions. Improving Energy Efficiency Aims To Ensure Full Availability And Functionality Of The Facility For All Users. Additionally, The Scope Of The Project Includes Raising And Improving The Technical Condition And Adapting The Building To The Needs Of The Facilitys Use By Disabled People, In Particular Disabled People Using Wheelchairs. The Following Construction Works Are Planned As Part Of The Investment: • Insulation Of The Buildings Facade With Mineral Wool. 20 Cm With Plaster Coating Made Of Mineral Plaster, Thickness. 1.5Mm, • Preparation And Cleaning Of The Foundation Wall Surface, Removal Of Defects. Performing Damp-Proof Insulation Of The Foundation Walls With A Double Layer Of Liquid Insulating Mass Made Of Bituminous Masses, • Thermal Insulation Of The Foundation Walls With Insulating Boards Made Of Extruded Polystyrene Xps, Thickness. 10 Cm, • Dismantling And Demolition Works Of Walls, Tiled Stoves, Radiator Installations, Sanitary Facilities, Dismantling Of The Electrical Installation Along With Fixtures And Electrical Equipment, • Replacement Of Floors Along With The Installation Of New Thermal And Moisture-Proof Insulation Layers Throughout The Facility, • Replacement Of Pvc Windows And Doors In The Building, • Reconstruction Of The Kitchen Area Along With The Replacement Of The Wooden Structure Of The Roof, Construction New Roof Covering Made Of Tar Paper, Insulation Made Of Mineral Wool. 20 And Installation Of A Ceiling Lining Made Of Plasterboard On A Steel Grate, • Reconstruction Of The Toilet In The Facility Along With The Construction Of New Water And Sewage Installations, Installation Of Sanitary Equipment (White Assembly), I.E.: 1 Toilet Bowl, 3 Urinals, 2 Washbasins, • Widening The Door Openings To The Toilet Rooms, • Construction Of A New Toilet Room By Separating A Toilet For Disabled People Moving On The Wheelchairs In Place Of The Liquidated Conventional Boiler Room, Installation Of Sanitary Equipment Adapted For Disabled People, • Renovation And Strengthening Of Suspended Coffered Ceilings, Installation Of Thermal Insulation Made Of Mineral Wool. 20 Cm With The Use Of A Pe Foil Vapor Barrier, • Reconstruction Of The Ramp For Disabled People In Wheelchairs, Ensuring Access To The Facility For People With Limited Mobility, In Accordance With The Applicable Provisions Of The Construction Law And The Regulation Of The Minister Of Transport And Technology Of 2024, Item 724 Regarding The Technical Conditions To Be Met By Buildings And Their Location, • Reconstructio
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.