Elering As (Elering) Is Building The 110Kv Line L052 Soo-Võru. The Line Will Be Built Partly As A Cable Line And Partly As An Overhead Line. The Construction Is Carried Out Using The Turnkey Method. Turnkey Means That All Equipment And Materials Within The Scope Of The Project Are Delivered Together With The Necessary Design Work, Installed, Checked, Etc. And Finally Handed Over To The Customer In Energized Form. More Detailed Conditions Of The Procurement Are Provided In The Basic Documents Of The Public Procurement. The Project Documentation Is Available From The Link: Https://Elering1.Sharepoint.Com/:F:/S/Eleringasirhad/Igdx4qftdazksz__R8cuw9dpaa3jx27luiyburhexezoxli?E=7Cvvkd
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.