Construction Of Flood Mitigation Works Along Bessette Creek For Two Work Packages. . The Work Includes Construction Of Flood Mitigation Works Along Bessette Creek For The Following Work Packages: Work Package No. 1(Quesnel To Maple St. Dike): Construction Of Approximately 500 M Of Az19-700 Steel Sheet Pile Dike From Quesnel Road To Maple Street Along The Right Bank Of Bessette Creek, Including Excavation, Utility Protection, Vibration And Settlement Monitoring, Environmental Mitigation Measures, Steel Capping Installation, Tie-Ins, And Associated Property Restoration Works As Required. Work Package No. 2(Wwt Lagoons Bank Protection): Construction Of Approximately 160 M Of Class 50 Kg Riprap Bank Protection And Live-Staking Along The Left Bank Of Bessette Creek Adjacent To The Village’S Wastewater Treatment Facility Lagoons, Including Erosion And Sediment Control Measures, Stream Isolation And Water Management, Subgrade Shaping, Environmental Protection Measures, Riprap Placement And Associated Restoration Works.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.