Electrical Wiring And Fitting Work – N09.62 Mp-080292 - Ep Sion Est - Sierre Est - Lot 1002 - Energy And Cabling (Id 11787). This Lot Provides For Work To Renew The Energy Distribution And Cabling Installations In The Sierre Tunnel And In The Open Air On The N09 Motorway Between Kilometers 103,600 And 116,900. This Lot Is Part Of The Uplans Maintenance Work And Includes The Supply, Installation And Commissioning Of The Following Equipment: * The New Energy Distribution Of Equipment In Tunnels And Open Air, Including Energy Management Systems, * The Photovoltaic Installation Of Itagne * Thermography Of Renovated Installations * Ipnetz And Optical Fiber Cabling, * Grounding Of All Equipment * Raised Floors * Envelopes And Set Of Base * The Control Cabinets And Associated Programming, With Plc And All The Necessary Elements. This Lot Also Ensures The Dismantling Of The Existing Energy Distribution And Cabling Installations Over The Entire Section In Several Stages.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.