Repair And Maintenance Services Of Locomotive Brakes And Brake Parts – Repair Of Brake Parts Of Tw6000 Trams. Repair Of Brake Components Of Tw6000 Trams, Within The Framework Of A Business Framework Contract (Service Order). Total Quantity (Planned): 98 Pcs/24 Months. The Details Of The Individual Items Are Contained In The Price Table And The Technical Drawings. The Quantities Specified In The Price Table Have Been Determined For 12 Months Based On Previous Usage Experience, So-Called Empirical Quantities. The Experimental Quantities Have Been Given For The Purpose Of A Well-Founded Assessment Of The Offers, To Determine The Total Offer Price Without Vat, The Quantities Procured Under The Contract May Differ From These Experimental Data. The Bidder Must Submit His Bid In The Knowledge Of The Above. Only The Unit Prices Are Indicated In The Annex To The Contract To Be Concluded. The Tenderer Undertakes To Issue An Order With A Total Value Of 70% Of The Total Sum Fixed In The Framework Contract. The Tenderer Draws Attention To The 321/2015. (X. 30.) To The Provisions Of Section 46 (3) Of The Government Decree. The Bidder Must Restore The Parts To Be Repaired To Their Original State. The Parts Must Be Repaired Based On The Published Technical Drawings And Given Identifiers. In Its Offer, The Offeror Must Declare, Duly Signed, That: • Undertakes The Performance In The Schedule Requested By The Requester And In The Quantity According To The Orders; • Has Repair Technology, The Tools, Special Machines, Installation Materials And Specialists Necessary To Carry Out The Repairs; • About The Agreed Completion Deadline (Up To 60 Calendar Days); • Undertakes That In The Event Of A Defect Occurring Within The Scope Of The Warranty Obligation, It Will Start Fulfilling Its Warranty Obligation Within No More Than 2 Working Days, I.E. It Will Conduct A Warranty Defect Inspection And Repair The Defect As Soon As Possible; • That In The Event Of A Failure During The Warranty Period, He Undertakes To Compensate For The Damages Resulting From The Failure; • Provides The Contracting Authority With The Opportunity For Inspection Between Repairs During The Contract Period, For Which It Provides All The Means And Conditions; • Acknowledges That In Case Of Winning, The Components Must Be Provided With A Certificate Of Works, In Which The Contractor Declares Their Appropriate Quality, According To The Draft Contract That Is Part Of The Public Procurement Documents; • In The Event Of A Breakdown During The Warranty Period, Undertakes To Compensate For The Damages Resulting From The Breakdown; • Ensures The Delivery Of The Parts To Be Repaired From The Place Of Delivery, As Well As The Return Delivery Of The Repaired Parts, For Which No Separate Fee Is Charged; • Ensures The Integrity Of The Parts During Transport And Storage, Protects The Parts Against The Ingress Of Dust, Water, Moisture, Mechanical Damage And Other Contaminants, As Well As Against External Damage And Disintegration; • Acknowledges That The Contracting Authority Sends Orders By E-Mail Only, For Which Purpose, In Case Of Winning, It Ensures That H
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.