Pressure Testing And Flushing Of The Heating System With Issuance Of A 100% Readiness Certificate, Installation Of An Elevator Unit With Proven Temperature And Pressure Control Devices. The Elevator Nozzle Diameter Is Calculated According To The Contractual Load Specified In The Technical Specifications. Calculation D Of The Nozzle Is Performed Depending On The Thermal Load On The Heating And Hot Water Systems According To The Specifications. Install The Ssu On Each Node Input.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.