The Bosdreef Will Be Moved North In Two Phases To Make Room For The New Residential Area Nieuw Kralingen And A Business Strip. Phase 1 Was Completed In 2024. These Tender Documents Describe The Assignment And Tender For Phase 2. The Purpose Of The Assignment Is The Realization Of Phase 2 Of The Rerouted Bosdreef As A Full-Fledged Northern Access Route (1X2-Lane Road, 50 Km/H) To Replace The Current Bosdreef (Currently 2X2-Lane Road, 70 Km/H). The Assignment Described In This Tender Procedure Concerns: •New Road Route (50 Km/H Distributor Road) With Foundation, Paving, Marking And Road Furniture •Complete Sewerage System (Rain And Waste Water) Connecting To Existing Infrastructure •Operational Vris And Public Lighting •New, Wider Concrete Crooswijkse Bridge (Non-Movable) •Integrated Infrastructure System •Complete Connection Between Phase 1 And Phase 2 •Permits, Inspections, Delivery Documentation And Transfer To Management (Raw System)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.