Tenders Are Invited For Execution Of Construction Works In The Sports Block At Primary School No. 14 In Zabrze At Ul. Gdańska 10 - Implementation Of The Task Always Safe In The Fourteen - Renovation Of The Gymnasium (...)
Tenders Are Invited For Execution Of Construction Works In The Sports Block At Primary School No. 14 In Zabrze At Ul. Gdańska 10 - Implementation Of The Task Always Safe In The Fourteen - Renovation Of The Gymnasium (...)
The Subject Of The Order Is The Performance Of Construction Works In The Sports Block At The Primary School No. 14 In Zabrze At Ul. Gdańska 10 A Detailed Description Of The Subject Of The Contract Is Included In The Design Documentation Prepared By M.Sc. Eng. Arch. Ryszard Kwosek, Designing Ryszard Kwosek, Ul. Północna 10, 40 658 Katowice, Regarding The Task Entitled Always Safe In Fourteen - Renovation Of The Gymnasium And Expansion Of Video Monitoring At The Primary School With Integration Departments No. 14. Adam Mickiewicz In Zabrze, Implemented On Plot No. 553/15. Consisting Of The Following Parts: • Architectural And Construction Design (Execution Design), • Technical Design For The Electrical Industry, • Technical Specification For The Execution And Acceptance Of Works, • Bill Of Quantities. The Scope Of The Task Includes The Execution Of Construction Works In The Gymnasium At The Primary School No. 14 In Zabrze, Consisting Of: • Dismantling And Installation Of Gymnasium Equipment, • Replacement Of The Sports Floor, • Replacement Of Selected Door Joinery, • Replacement Of Radiator Covers, • Renovation Of Gable Walls, Renovation Of Longitudinal Walls, • Painting Of Walls And Ceiling, • Unblocking Ventilation Ducts In Gable Walls, • Replacement Of Fans In The Gymnasium Along With Power Supply And Control, • Replacement Of Lighting In The Gymnasium, • Installation Of A Lighting And Ventilation Control Cassette, • Repair External Façade Under The Window Of The Gymnasium, • Execution Of Accompanying Works, • Delivery And Installation Of The Zbo Information Board Next To The Gymnasium (Dimensions 70X90cm, Made Of 3Mm Dibond Composite Board). Note. The Scope Of The Task Does Not Include Video Monitoring And Replacement Of The Electrical Installation. The New Lighting Should Be Connected To The Existing Electrical Installation. The Electrical Power Supply For Ventilation Should Be Routed From The Lighting Control Cassette In Accordance With The Design. A Detailed Description Of The Subject Of The Order Is Included In Part Iii Of The Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.