Preventive Maintenance, Preparation For Verification Of Cold Water Meter Du 25-1Pcs. Dismantling Water Meters (Cold). Technical Preparation For Verification (Replacing The Calculator Battery, Cleaning Flow Meters) And Transferring The Water Meter Complete With Electromagnetic Flow Meters To The Standardization Bodies For The Next Verification (With The Issuance Of A Certificate). Installation Of Water Meters (Cold). Removing And Installing A Water Meter., Preventive Maintenance, Preparation For Verification Of The Cold Water Meter Du 32-1Pcs. Preventive Maintenance, Preparation For Verification Of Hot Water Meter Du 20-1Pcs. Dismantling Of Water Meters (Hot And Cold). Technical Preparation For Verification (Replacing The Calculator Battery, Cleaning Flow Meters) And Transferring The Water Meter Complete With Electromagnetic Flow Meters To The Standardization Bodies For The Next Verification (With The Issuance Of A Certificate). Installation Of Water Meters (Hot And Cold). Removing And Installing A Water Meter.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.