Part No. 1: Construction Of A Water Supply Network In Szczecno The Task Covers The Following Scope: A) Installation Of 90 Mm Pvc Pipes With A Length Of - 1,017.20 M) Installation Of Fire Hydrants. Aboveground Dn 80 Mm - 6 Sets The Detailed Scope Of Works From The W6 Node To The W61 Node Is Included In The Technical Documentation (Design Documentation And Technical Specification For The Execution And Acceptance Of Works) Which Is An Annex To The Tender. The Ordering Party For The Implementation Of The Investment In Question Has Information About The Lack Of Objection, Reference Number: B-Ii.6743.15-49.2021 Of May 31, 2021, Issued By The Starosta Of Kielce.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.