GTR 114502216

Tenders Are Invited For Hansa Coking Plant - Training Workshop: Concrete Work On The Foundation Slab

ICB — International Competitive Bid Closes Jul 17, 2026 — 7 days left Western Europe
Tender Information
GTR Reference
114502216
Tendering Authority
Subscribe to view
Tender No
CXPNY4PD2CR
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Hansa Coking Plant - Training Workshop: Concrete Work On The Foundation Slab
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
17-07-2026 7 days left
Work Detail
The Aim Of The Measure Is To Produce A New, Load-Distributing Foundation Slab Within The Existing Training Workshop Building In Preparation For Further Measures To Improve The Foundation And Strengthen The Structure. For This Purpose, The Ground Floor Interior Of The Training Workshop Will Be Gutted On Site And The Existing Floor Slab And Its Substructure Will Be Removed. The Construction Site Will Be Handed Over To The Contractor After The On-Site Sealing Against The Subsoil And The Introduction Of A Clean Layer Of Lean Concrete For The Production Of The Foundation Slab. Ok Clean Layer Is Approx. -1M Below The Surrounding Ground Level, Which Must Be Taken Into Account With Regard To Material Transport As Well As The Fact That All Material Must Be Brought Into The Building Through Existing Door/Gate/Wall Openings. Delivery By Crane Is Not Possible. The Foundation Slab Must Be Manufactured In Three Concreting Sections With A Component Thickness Of 1.00M. The Panel Is Worked Against Existing Walls And Supports And Separated From Them With A Sliding Layer. Reinforcement Connections To Existing Stb Components Do Not Need To Be Made. The Reinforcement Of The Foundation Slab Must Be Joined On Site Entirely From Steel Bars Of Different Diameters. In The Area Of ​​Existing Stb Columns, Connecting Reinforcement Must Be Provided For The Later Addition Of New Column Feet. Furthermore, During The Course Of The Reinforcement Work, Empty Sleeves Must Be Incorporated Into The Reinforcement Cages For The Later Implementation Of Foundation Piles (Micro Piles 65Mm Diameter). The Steel Sleeves Are Provided On Site And, Due To Their Close-Meshed Arrangement, Also Serve As Spacers Between The Lower And Upper Reinforcement.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
82019764-544f-4c1b-bce7-c259b8f5d270.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders