Tenders Are Invited For Supply, Installation, Configuration And Commissioning Of A High-Performance Computing Cluster Of At Least 3072 Computing Cores (Hpc), Based On 4 High-Intensity Chassis, With The Capacity To Host 4 Computing Servers In A Reduced Space Of 2U For The Research Project “Red Teaming The H0. The Supply Comprises, In An Integrated Manner, The Following Elements: - Computing Nodes Based On High-Performance Cpu And Gpu. - High-Capacity And Performance Storage System, Including The Storage Node And The Associated Cabin.- Access Nodes (Login) For Users.- High-Speed Communications Infrastructure- Technical Racks With Advanced Cooling Systems.- Specific Base Software For Hpc Environments, Including The Operating System And The Management And Execution Tools For Scientific Loads.- All The Auxiliary Elements Necessary For The Correct Electrical And Data Interconnection Of The Solution. Funding: Redh0t Project-Red Teaming The H0 Tension With Ga Number 101225120, Funded By The
Tenders Are Invited For Supply, Installation, Configuration And Commissioning Of A High-Performance Computing Cluster Of At Least 3072 Computing Cores (Hpc), Based On 4 High-Intensity Chassis, With The Capacity To Host 4 Computing Servers In A Reduced Space Of 2U For The Research Project “Red Teaming The H0. The Supply Comprises, In An Integrated Manner, The Following Elements: - Computing Nodes Based On High-Performance Cpu And Gpu. - High-Capacity And Performance Storage System, Including The Storage Node And The Associated Cabin.- Access Nodes (Login) For Users.- High-Speed Communications Infrastructure- Technical Racks With Advanced Cooling Systems.- Specific Base Software For Hpc Environments, Including The Operating System And The Management And Execution Tools For Scientific Loads.- All The Auxiliary Elements Necessary For The Correct Electrical And Data Interconnection Of The Solution. Funding: Redh0t Project-Red Teaming The H0 Tension With Ga Number 101225120, Funded By The
Supply, Installation, Configuration And Commissioning Of A High-Performance Computing Cluster Of At Least 3072 Computing Cores (Hpc), Based On 4 High-Intensity Chassis, With The Capacity To Host 4 Computing Servers In A Reduced Space Of 2U For The Research Project “Red Teaming The H0. The Supply Comprises, In An Integrated Manner, The Following Elements: - Computing Nodes Based On High-Performance Cpu And Gpu. - High-Capacity And Performance Storage System, Including The Storage Node And The Associated Cabin.- Access Nodes (Login) For Users.- High-Speed Communications Infrastructure- Technical Racks With Advanced Cooling Systems.- Specific Base Software For Hpc Environments, Including The Operating System And The Management And Execution Tools For Scientific Loads.- All The Auxiliary Elements Necessary For The Correct Electrical And Data Interconnection Of The Solution. Funding: Redh0t Project-Red Teaming The H0 Tension With Ga Number 101225120, Funded By The European Commission, Horizon Europe-Erc-2025-Syg. Ip: Licia Verde.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.