According To The Tender Documents, The Construction Site Is The Construction Of Main Water Pipes And Waste Water Drainage As Well As Pressure Drainage Of Purified Waste Water For The Business Area Of Länsi-Säkylä, Which Partly Replaces The Current Open Ditch And Partly The Current Asbestos Cement Pressure Sewer. For The Treated Wastewater Drainage Line, A Wastewater Pumping Station Will Be Constructed On The Side Of The Apetit Oyj Factory Area Inside The Enclosure, With Which The Purified Water From Säkylä Municipalitys And Apetit Oyjs Treatment Plants Will Be Pumped By Pressure Drainage To The Pressure Sewer On The North Side Of The Existing Jv Pumping Station. The Current Treated Wastewater Pumping Station Will Be Taken Out Of Use After The Completion Of The Contract. The Total Length Of The Pipelines To Be Built Is Approx. 3,900 M. In Addition, A New Jv Pumping Station For Dirty Wastewater Will Be Built On The Bank Of The Kauniinsantanti, Serving The Business Area. The Comparison Basis For Offers Is The Total Contract Price. The Offer Gives: Part Cost Price 1 (Includes, According To The Plans, The Treated Wastewater Pumping Station With The Structures Included In The Contract Until The Operational Condition And From Then On The Water Supply Construction Included In The Water Supply Contract Up To The Connection Point On The North Side Of The Existing Jv Pumping Station, The Disconnection Of The Backup Power Equipment From The Current Jv Pumping Station And The Installation And Connection To The New Jv Pumping Station, As Well As The Construction Of All Other Water Supply And Drainage Systems, E.G. Part).Subcontract Price 2 (In Accordance With The Plans, Includes All Water Supply Construction Subcontract Price 1 From The Southeast Side Of The Interface To The Drainage Well Located At The End Of Metsämiehentie) Subcontract Prices 1 And 2, Added Together, Form The Total Contract Price, Which Includes The Works Included In The Contract Presented In The Tender Documents When Fully Completed. Exact Comparison Price Säkylä Municipality-Apetit Oyj: Purified Wastewater Construction Of Pressure Drainage From The New Treated Wastewater Pumping Station To The Connection Point On The North Side Of The Existing Pumping Station. Construction Of A Purified Wastewater Pumping Station With Yard Areas And Electrical Installations (Transfer Of Back-Up Power From The Current Pumping Station Installed In Operational Condition To A New Location). No Other Water Supply And Sewage Pipelines Will Be Installed In The Same Trench. Bid Prices Are Given Without Vat. The Work Must Start No Later Than 19 October 2026. The Contract Must Be Completed In All Respects And Approved No Later Than June 11, 2027. Intermediate Goals Of The Contract:- The Pipe Section Between Apetit Oyjs Wastewater Basins And Säkyläntie Must Be Built By 12 November 2026 Until Completion - The New Drainage System For Clean Wastewater Must Be Fully Operational By 31 May 2027, Starting From Kiviniittyntie To The Junction North Of The Current Jv Pumping Station. The Contractor Of The Section Between Kiviniittyntie And Metsämiehentie Can Carry Out The Contract In The Final Stage.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.