The Procurement Includes The Construction Of A New Street Junction To Kantatie 54, The Construction Of Nahkurintie And Sakuratie, And The Construction Of Water Supply In Accordance With The Attached Request For Tender. The Road Junction Is Channeled In The Main Direction With Painting. The Widening Of The Carriageway At The Junction Will Be Done On The South Side Of The Road. The Carriageway Junction Will Be Illuminated. Uimarantas Private Road Will Be Moved Outside The Access Area, Which Includes The Crossing Of Nahkurinoja. There Will Be Approx. 80 M Of Street Construction On Nahkurintie And 110 M On Sakuratie. The Street Sections Will Be Built Already, Including Street Lighting. Stormwater Is Mainly Led In Open Ditches. A Water Supply Will Be Built In The Street Area. The Trunk Lines Of The Water Supply Will Be Built From The Kisällintie Pumping Station To The Oitti Pumping Station. A Drainage System Will Be Built On Nahkurintie, And Water Supply Plot Reservations Will Be Made For The Plots According To The Site Plan. Nahkurintie Outside The Street Construction Will Remain Arable Land After The Construction Of The Water Supply. Space Will Be Allocated From The Contract Area For Storage And Possible Site Services. Clean Waste From The Construction Site Is Accepted At Kisällintie 6. The Construction Area Has A Break Kiosk That Operates During The Summer, A Carpet Washing Place And A Connection To Puujokis Swimming Area. The Construction Work Will Be Completed By October 15, 2027.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.