Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
17-06-2026
Work Detail
Quotation are invited for Supply and Installation of Cables and Cable Trays for K Swro New Cartridge Filters Motor Operated Valves 1032602463 1 ITEM-00001 SUPPLY AND INSTALLATION OF 3 ARMOURED CABLES AND TERMINATION.SCOPE OF WORK:-#LAYING OF ABOVE GROUND 0.6/1KV 4 CORE CABLE: (4C X 2.5 SQMM CU/XLPE/SWA/PVC LV), LENGTH: 50 METERS.-#LAYING OF ABOVE GROUND 0.6/1KV 4 CORE CABLE: (4C X 2.5 SQMM CU/XLPE/SWA/PVC LV), LENGT H: 65 METERS.-#LAYING OF ABOVE GROUND 0.6/1KV 4 CORE CABLE: (4C X 2.5 SQMM CU/XLPE/SWA/PVC LV), LENGTH: 65 METERS.-#CABLES TO BE LAI D USING EXISTING CABLE TRAYS.-#GLANDING AND TERMINATION OF THE NEW CABLES WITH SUITABLE GLANDS, LUGSAND INSULATING SLEEVES FROM BOTH ENDS.-#CABLES BRAND: DUCAB. NO OTHER BRAND WILL BE ACCEPTED.SUPPLY AND INSTALLATION OF GRP CABLE TRAYS.SCOPE OF WORK:-#SUPPLY AND I NSTALLATION OF GRP CABLE TRAYS WITH ASSOCIATED MOUNTINGPLATES AND ACCESSORIES.-#SIZE: 55X55 MM. LENGTH: 30 1 JOB METERS.-#ANCHOR BOLTS SIZ E: 10MM.-#THREAD RODS SIZE: 10MM.-#BIDDER TO CONDUCT A SITE VISIT TO MEASURE ACTUAL LENGTH OF REQUIREDCABLE TRAYS AS PER SITE CONDIT ION.GENERAL TERMS AND CONDITION:-#CONTRACTOR SHALL SUBMIT METHOD OF STATEMENT AND SCHEDULE ON RECEIPTOF PO.-#BIDDER MUST SUPPLY MATE RIAL AND CABLE DATASHEETS WITH THEIR OFFER.-#THE CONTRACTOR SHALL ENSURE HOUSEKEEPING ON A DAILY BASIS AND BERESPONSIBLE FOR ALL SIT E MATERIAL DISPOSALS TO DESIGNATED PLACES.-#AII DEWA SAFETY & ENVIRONMENT POLICY, RULES AND REGULATION SHALL BEFOLLOWED AT WORK SITE DURING THE EXECUTION OF THE WORK.-#SCAFFOLDINGS IF REQUIRED FOR WORK SHALL BE ARRANGED BY DEWA.-#CONTRACTOR SHOULD ARRANGE ALL RIGG ING TOOLS AND OTHER TRANSPORTINGEQUIPMENT. THIS EQUIPMENT SHOULD BE DULY TESTED AND CERTIFIED BY 3RDPARTY INSPECTION AGENCY AND THE CERTIFICATE SHOULD BE PRODUCED ONDEMAND.-#THE WORK SHALL BE EXECUTED UNDER DEWA SUPERVISION AND AS PERQUALITY/SCHEDULE REQUIREMENT. #CONTRACTOR#S SUPERVISOR SHALL BE AVAILABLE AT SITE THROUGHOUT THEPERIOD OF WORK.-#DEWA WILL ARRANGE NECESSARY PTW/LC/HOT WORK PERMI TS AND CONTACTORMUST FULLY COMPLY WITH ALL CONDITIONS CONTAINED IN THE PERMITS SPECIAL NOTES / INSTRUCTIONS: Supply and installation of cables and cable trays for K SWRO new cartridge filters motor operated valves. For more information, please contact Mohammad Alblooshi [email protected] 048025361 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601385)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.