Tenders Are Invited For Stage I Of Construction Works - Construction Of Small Architectural Elements On Plot No. 12/24 (...) 42-400 Zawiercie As Part Of (...) Development Of The Area Of Plot No. 12/24 At Ul. Sienkiewicz.
Tenders Are Invited For Stage I Of Construction Works - Construction Of Small Architectural Elements On Plot No. 12/24 (...) 42-400 Zawiercie As Part Of (...) Development Of The Area Of Plot No. 12/24 At Ul. Sienkiewicz.
1. The Subject Of The Order Is: Stage I Of Construction Works, Construction Of Small Architectural Elements On Plot No. 12/24 (Precinct 0012, Zawiercie) 42-400 Zawiercie As Part Of The Investment Project Entitled: Development Of The Area Of Plot No. 12/24 At Ul. Sienkiewicza.2. Existing Condition Of Development Of The Investment Area: The Area Covered By The Study Is Located On The Undeveloped Plot 12/24 At Ul. Sienkiewicza In Zawiercie. The Development Covers Part Of The Plot Where There Is Currently An Outdoor Gym, The Area Intended For Development Is Mostly Flat, Paved With An Asphalt Surface.3. The Scope Of The Order Includes: 1) Demolition Of The Existing Bituminous Surface With Sub-Base - 547 M²; 2) Demolition Of The Existing Paving Stone Surface With Sub-Base - 79 M²; 3) Replenishment Of The Surface After Demolition With Topsoil And Sowing - 626 M²; 4) Construction Of A Panel Fence With A Gate - 68, 75 M²; 5) Construction Of The Surface With Imitation Wood Terrace Slab, 4 Cm Thick Base 53 M²;6) Construction Of A Safe Poured Hpdm Surface With Structural Layers Of The Base - 178.2 M²;7) Delivery And Installation Of Stage 1 Equipment Along With Foundations: - Information Board - 1 Pc; - Round Park Benches - 3 Pcs; - Garbage Bin - 1 Pc; - Linear Park Device With A Total Height Of 3.5 M (+/- 10 %) Consisting Of 9 Stations - 1 Set; 9 Stations Of The Rope Park: Pit Stop, Postman, Boats, Double Balance Beam, Plank Bridge, Interlace, Big Town, Drawbridge, Tri-Jump8) Construction Of A Solar Lantern With A Height Of 6 M (+/-10%) - 3 Sets;9) Decorative Greenery Of Stage I In Accordance With The Detailed Design, Table 2 - Material Quantity Plant - 290 Seedlings With Fertile Soil And Mulching, Pine Bark On Fiber. Note: The Design Documentation Includes Stage I And Stage Ii. The Scope Of The Investment Covered By This Public Procurement Procedure Includes Only Stage I. 4. A Detailed Description Of The Subject Of The Order Is Specified In The Design Documentation Together With Errata, Technical Specification For The Execution And Acceptance Of Construction Works And The Bill Of Quantities (As An Element Auxiliary For Price Calculation), Which Constitute Annexes To The Specification Of The Terms Of The Contract (Hereinafter Referred To As The Tor). Supplier, Patent, Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor Or The Indication Of Standards, European Technical Assessments, Common Technical Specifications Or Other References Referred To In Article 101(1) Point 2 Or (3) Of The Public Procurement Law Allows The Submission Of An Equivalent Offer In Accordance With Article 101(4) Of The Public Procurement Law Equivalent Solutions To Those Indicated In The Documentation, Provided That They Ensure Technical Parameters Not Worse Than Those Assumed In The Documentation And Are Consistent In Terms Of: A) Dimensions And Structure (Dimensional Tolerance +/- 10%), Type, Physical Properties, Number O
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.