The Subject Of The Order Is The Execution Of Construction Works (Stage I) As Part Of The Task Entitled: Construction Of A Recreation And Sports Zone With A Mini Playground At Ul. Nowowiejska Stage I - B.O. In Kędzierzyn-Koźle In Particular: In The Scope Of Small Architecture Objects In Public Places: 1) Measurement Works - Surveying Works 2) Construction Of A Safe Sand Surface 3) Construction Of A Mineral Surface 4) Construction Of A Surface Made Of Concrete Cubes 5) Construction Of A Fence On A Concrete Foundation With A Wicket And A Service Gate 6) Construction Of A Sowing Lawn 7) Delivery And Installation Of Playground And Recreational Equipment 1. Set 2. Two-Module Swing (Storks Nest, Flat Seat, Bucket Seat) 3. Fitness Set 4. Obstacle Course 5. Elliptical Trainer 6. Twister 7. Stepper 8. Tai-Chi Rings 9. Benches With Backrest 10. Waste Bin For Waste Segregation 11. Boards With Regulations 12. Bicycle Racks 13. Deckchairs Urban8) Preparation Of Post-Construction Geodetic Inventoryin The Field Of Lighting And Monitoring:1) Excavations For Cables And Lighting Poles2) Laying Of The Lv Cable Network3) Laying Of The Telecommunications Cable Network4) Laying Of The Earthing Network5) Installation Of Lighting Poles With Luminaires6) Installation Of Monitoring Cameras7) Preparation And Assembly Of A Complete So Cabinet With A Foundation8) Preparation And Assembly Of A Complete Cabinet Scctv With Foundation9) Execution Of Tests And Measurements Of Cable And Telecommunication Lines With Grounding10) Alignment, Calibration, Purchase Of License11) Execution Of Photometric Measurements Based On The Technical And Executive Design Prepared By: Land Art Projekt Sp. Ul. Lipowa 3/24, 30-702 Krakównote: The Scope Of The Order Does Not Include The Works. Related To Planting Trees.5. The Contractor, No Later Than On The Day Of Handing Over The Construction Site, Must Have And Submit To The Ordering Party A Paid Liability Insurance Document For The Conducted Business Activity With A Guarantee Amount Of Pln 250,000.00 For One And All Events During The Insurance Period.6. The Detailed Scope Of The Contractors Obligations Is Specified In The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And Any Other Documents Constituting Part Of This Agreement This, The Contractor, Within The Agreed Lump Sum Remuneration, Will Perform All Activities That Are Objectively Necessary For The Proper Implementation Of The Subject Order.7. The Works Will Be Carried Out In Accordance With This Agreement, The Specification Of The Order Conditions, The Design Documentation, The Technical Specifications For The Execution And Acceptance Of Construction Works, Applicable Regulations, Polish Standards And Principles Of Technical Knowledge And With Due Care In Relation To Their Execution, Safety, Good Quality And Proper Organization. In The Event Of Inconsistencies Between Individual Documents Constituting The Agreement, More Detailed Provisi
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.