GTR 114314205
Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.495 Km Long, 4 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With 0.10 M Thick Red Gravel - The Second Foundation Layer Should Be Filled With 0.15 M Thick Concrete Paving - Concrete Work Can Be Used With Concrete Or Concrete Mix Must Be Tied To A Width Of 0.20 Meters And The Correct Placement Of The Height Of 0.075 Meters - 20 Meters Of Joint Expansion Work Must Use 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
ICB — International Competitive Bid
Closed
South-Eastern Asia
Tender Information
GTR Reference
114314205
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.495 Km Long, 4 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With 0.10 M Thick Red Gravel - The Second Foundation Layer Should Be Filled With 0.15 M Thick Concrete Paving - Concrete Work Can Be Used With Concrete Or Concrete Mix Must Be Tied To A Width Of 0.20 Meters And The Correct Placement Of The Height Of 0.075 Meters - 20 Meters Of Joint Expansion Work Must Use 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South-Eastern Asia
Political Region
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
Last Date of Bid Submission
29-06-2026
Closed
Work Detail
Construction of 1 main concrete road, 0.495 km long, 4 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil shoulder width of 0.5 m wide, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with 0.10 m thick red gravel - The second foundation layer should be filled with 0.15 m thick concrete paving - Concrete work can be used with concrete or concrete mix Must be tied to a width of 0.20 meters and the correct placement of the height of 0.075 meters - 20 meters of joint expansion work must use 14 mm cane bars. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3bfcd414-bd9f-4fbe-8f9c-426e3e84a14b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.