On Elin Pelin Street, There Is An Eternite Water Supply System F 110. It Is In A Bad Condition, Often Breaks Down And The Water Supply Has To Be Stopped To Eliminate Accidents. There Are 4 Existing Fire Hydrants Along The Length Of The Water Pipeline. The Street Water Pipe Subject To Reconstruction Is About 500 M Long. The Water Pipe Is Planned To Be Reconstructed With Pe Hd. The Route Is Entirely Located Within The Settlement And Complies With The Regulation Plan Of Duvanlii. The Route Passes 1 Meter From The Street Regulation. Total Length Of Pehd Dn 110 – 499.15 M. The Street Water Pipe Will Be Laid In A Trench And With A Cover Of At Least 1.20 M. The Connections Between The Pipes Should Be Made By Butt Welding For The Water Supply Branches And By Quick Electric Welding On The Building Deviations. It Is Planned To Place A Signal Strip To Be Placed At A Shallower Depth - From 0.30 M To 0.50 M From The Field. Shut-Off Valves Are Provided - Smooth With A Rubberized Wedge. Four New Fire Hydrants Are Planned Along The Route Of The Water Pipeline. The Distribution Of Water To The Buildings Will Be Through Building Diversions, Which Will Be Polyethylene Pipes With A Diameter Of Dn 25, For A Pressure Of 10 Atm. A Detailed Description Of The Types And Quantities Of Work Planned For Execution Is Contained In The Technical Specification And Bill Of Quantities, An Integral Part Of The Order Documentation. There Is An Approved Investment Project For The Sites Available To The Participants
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.