The Subject Of The Order Envisages Carrying Out Construction Activities On San Stefano Street, Lehchevo Village And Hristo Botev Street, Kobilyak Village. The Planned Construction Activities For The Two Streets Include Excavation Of The Existing Pavement And Road Base With A Thickness Of About 0.40 M, Then Making A Road Structure With A Thickness Of 0.30 M From Crushed Stone With An Irregular Grain Size. To Improve The Evenness And Improve The Technical Parameters Of The Streets, Two Layers Of Asphalt Concrete Are Chosen: - A Layer Of Non-Dense Asphalt Concrete (Binder) E=1000 Mpa With A Thickness Of 6 Cm; - A Layer Of Dense Asphalt Concrete With E=1200 Mra. With A Thickness Of 4 Cm. Also, New Concrete Road Curbs 15/25/50 Cm Should Be Laid. Two-Sided Along The Entire Length Of The Street. At The Entrances To The Properties, Curbs Should Be Lowered. The Parameters Of The Streets Are As Follows: 1/ Lehchevo Village - Emergency Restoration Of San Stefano Street From 363-17-375-19 With Roadway Width - 7.00M And Length - 379.87M. And 2/ Kobilyak Village - Emergency Restoration Of Hristo Botev Street From 100-99-98- 28-27-26-24-23-22-21-20-19-18 With A Roadway Width From Pt1 To Pt43 – 7.00M. And From Pt45 To Pt74 – 6.00M. And Length – 737.26 M. The Total Length Of The Streets Is 1117.13 L.M. Construction Is The Fourth Category, According To Art. 137, Para. 1, Item 4, Letter E In Connection With Art. 137, Para. 1, Item 4, Letter A Of Zut.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.