Construction Of A Water Pipe System That Is Pumped From A Swamp In The Forest. The Facility Must Be Used In Winter To Produce Artificial Snow And Ice In The Rink (No Snow Cannon Or Ice Machine Is Included In The Procurement). In Connection With The Installation Of A Water Line In The Ground, A Compressed Air Line Is Also Installed In The Same Shaft. For Artificial Snow Production, Sockets Are Mounted At 100 Meter Intervals On Both Of These Lines. Outlets Are Installed At The Sports Hall And At The Soccer Field, Which Are Specified In The Detailed Planning. The Facilitys Suction Pump Must Be Frequency Controlled And Deliver At Least 2.5 Bar Pressure At Each Outlet. The Pump Manufacturer Must Guarantee On-Site Service And Access To Spare Parts For At Least 10 Years. The Pump Is Mounted In An Existing Container At The Swamp About 1 Km From The Sports Cabin. Any Additional Insulation Is The Responsibility Of The Customer. Electrical Installation According To Separate Planning In The Procurement Must Be Included In The Tender.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.