Scope Of The Task: 1. Renovation Of The Kitchen Proper With A Scullery And A Pantry: 1) Demolition Works - Disassembly And Removal Of Equipment, Dismantling Of Floors, Wall Tiles, Cleaning, Removal Of Debris 2) Replacement Of Window Frames With Aluminum Ones - Delivery And Reception Windows 3) Replacement Of 2 Entrance Doors To The Scullery With Aluminum Ones 4) Replacement Of Doors To The Pantry 5) Installation Of Sewer Lines 6) Building The Wall Above The Pass-Through Cupboard For Dishes 7) Laying Wall Tiles (30 X 60 Cm) And Floor Tiles (20 X 20 Cm) With Appropriate Resistance And Water Absorption 8) Painting Walls And Ceilings 9) Replacing Lighting Fixtures 10) Bringing In And Installing Equipment And Devices 2. Bathroom Renovation 1) Demolition Works - Dismantling The Floor, Wall Tiles And Sanitary Equipment, Cleaning, Removal Of Debris 2) Replacement Of Doors 3) Installation Of Wall And Floor Tiles, Installation Of Sewage Risers, Painting Of Walls And Ceilings 4) Installation Of Inlet And Outlet Approaches And New Sanitary Devices And Equipment 5) Replacement Of Lighting Fixtures And Connectors 3. Renovation Of Other Rooms Of The Feeding Block (Hallway, Staircase, 4 Warehouses, Staff Room) 1) Demolition Works - Disassembly Of Equipment, Dismantling The Floor And Wall Coverings, Cleaning, Removing Debris 2) Replacing Door Joinery 3) Installing Sewer Risers 4) Installing Wall And Floor Tiles With Appropriate Resistance And Water Absorption 5) Replacing Electrical Cables, Lighting Fixtures And Connectors 6) Bringing In And Installing Equipment4. Cleaning And Painting Of Ventilation Ducts 1) Cleaning, Degreasing And Painting5. Renovation Of The Central Heating Installation In All Rooms Of The Feeding Block (Kitchen Proper, Corridors, Staircase, 4 Storerooms, Staff Room, Peeling Room, Canteen, Rooms At The Entrance To The Dormitory, Basements Under The Feeding Block Rooms)1) Dismantling And Installation Of Pipelines, Radiators, Valves, Etc.2) Sealing Holes In Ceilings And Walls3) Performing Tightness Tests6. Renovation Of The Water Installation In All Rooms Of The Feeding Block (Kitchen Proper, Corridors, Staircase, 4 Storerooms, Staff Room, Peeling Room, Canteen, Rooms At The Entrance To The Dormitory, Basements Under The Feeding Block Rooms) 1) Disassembly And Installation Of Valve Pipelines 2) Forging And Bricking Up Furrows, Sealing Holes In Ceilings And Walls 3) Performing Tightness Tests 7. Renovation Of The Sewage System In All Rooms Of The Feeding Block (Kitchen Proper, Corridors, Staircase, 4 Storerooms, Staff Room, Peeling Room, Canteen, Rooms At The Entrance To The Dormitory, Basements Under The Feeding Block Rooms)1) Disassembly And Installation Of Sewage Pipes, Inlets With Anti-Odor Blocks, Etc.2) Cutting And Bricking Up Grooves In The Walls And Holes In The Ceilings 8. Renovation Entrance Vestibule With Stairs 1) Disassembly Of Wainscoting And Steel Radiator 2) Filling In Plaster Defects, Scraping And Washing Off Old Paint 3) Primin