Engineering Studies - Bypass Of Ettelbruck (B7/N15/Cr349) - Phase 1: Call For Applications. The Civil Engineering Mission Of This Contract Covers The “Design Studies” And The “Execution Studies” Necessary For The Creation Of A Nearby Ettelbruck Bypass. The Future Bypass Will Connect The N15 (Route De Bastogne) To Ettelbruck To The Town Of Warken And To The B7 Interchange Located Between Schieren And Ettelbruck. It Will Allow, In The Long Term, A Calming And Fundamental Redevelopment Of The N7 And N15 West Of Ettelbruck. The Length Of The Bypass In Question Will Be Approximately 2,730M, And Will Include Two Tunnels Of Approximately 735M And 995M, As Well As Three Engineering Structures, The First Of Which Will Span The Alzette Valley, A Second The Grondwee And The Haupeschbaach And A Third The Wark.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.