Road Construction Works – Securing The N7 Between Fridhaff And Weiswampach – Section 1 – Lot 3.1 Lipperscheid-Markenbach. Carrying Out The Security Of The N7 Over A Length Of 1300M, Pipeline Works, Retention Basins, Networks, Drainage, Road Works. Excavated Material: 46,200 M3 Backfill Using Excavated Material 24,900 M3 Various Filler Materials 29,100 M3 Excess Materials To Be Removed 21,300 M3 Supply Of Lime/Cement Mixture: 2,306 T Coated Material: 6,653 To Krc Implementation: 4,885 M3
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.