GTR 114282869
Request For Quotation Purchasing Spare Parts
ICB — International Competitive Bid
Closed
Central Asia
Tender Information
GTR Reference
114282869
Tendering Authority
Subscribe to view
Tender No
17172097
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
15-06-2026
Closed
Work Detail
Torque Transmission Up To 1500 N•M; Spline Connection; Balancing ≤15 G•Cm; Operating Angle Up To 25°; Lubrication Units; Vibration Resistance Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection, Expansion Tank Burst Pressure: At Least 2 Bar Uv Resistance Of The Material Availability Of A Level Sensor (Desirable) Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Rvd (Hoses) Standard: En 856 (Required) Working Pressure: Not Less Than 35 Mpa Burst Pressure: At Least 3 Times Reserve Temperature: −40…+120°C Test: Hydraulic Pressure Before Delivery Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Volume 10–20 Liters; Pressure Up To 1.5–2 Bar; Heat-Resistant Plastic; Resistance To Antifreeze; Level Sensor (Optional) Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Hydraulic Axial Piston Pump Displacement: 52 ± 2 Cm³/Rev Productivity: No Less Than 78 L/Min At 1500 Rpm Nominal Pressure: Not Less Than 320 Bar Maximum Pressure: At Least 350 Bar Peak Pressure: At Least 380 Bar Efficiency: No Less Than 92% Shaft Type: Splined Din, At Least 8 Splines Mounting Type: Iso Flange (4 Holes) Noise Level: No More Than 85 Db Resource: At Least 5000 Operating Hours Mandatory Requirement: Resistance To Long-Term Operation Under Load The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70 Equipment Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier
Key Value
Tender Value
616,379 - KZT
Tender Documents
Global Tender Document
fe908068-ef65-4c84-9aca-408f3538b193.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.