GTR 114282812

Request For Quotation Purchasing Spare Parts

ICB — International Competitive Bid Closed Central Asia
Tender Information
GTR Reference
114282812
Tendering Authority
Subscribe to view
Tender No
17172211
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
15-06-2026 Closed
Work Detail
Valve Block (Distributor) Pressure: At Least 315 Bar (Nominal) Peak Pressure: At Least 350 Bar Flow: At Least 100 L/Min Number Of Sections: At Least 4 Availability Of Safety Valve Internal Leaks: No More Than 5 Cm³/Min Mandatory Requirement: Smooth Movement Of Spools Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Axial Piston Pump Of Adjustable Volume; Working Volume 52–70 Cm³/Rev; Nominal Pressure Up To 320 Bar, Peak Up To 350 Bar; Flow Rate Up To 90 L/Min; Efficiency ≥90%; Cast Iron/Aluminum Alloy Body; Iso Splined Shaft; Resistant To Water Hammer; Operating Temperature −40…+80°C; Resource ≥5000 M/H Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Fitting; Threaded Steel/Brass/Crimp Connection; Pressure Resistance Up To 40 Mpa; Anti-Corrosion Coating; Compatibility With En856 Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Hydromagnetic Valve Response Time: ≤ 0.08 Sec Resource: At Least 1,500,000 Cycles Protection Class: Ip67 Mandatory Requirement: Coil Overheat Protection Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Headlights Luminous Flux: No Less Than 2000 Lm Service Life: At Least 30,000 Hours Impact Resistance: Ik08 Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier
Key Value
Tender Value
501,724 - KZT
Tender Documents
Global Tender Document
c456bea1-9c48-4eba-9e78-021dfd633d95.html
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders