This Work Includes The Supply Of All Labour, Materials, Equipment And Services Required To Complete The Construction Of Shared Pathways, On-Street Bike Lanes, And Local Street Bikeways.The Work Includes, But Is Not Limited To The Following:Mobilization And Demobilizationtraffic And Pedestrian Accommodation And Stagingwork Site Management Including Temporary Construction Facilities, Security, And Protection Of Existing Utilitiestree Protection And Tree Preservation Plansremoval Of Existing Concrete Walk, Curb And Gutter, Curb Ramps, Median Islands, Etc. Earthworks And Regrading Of Existing Landscaped Areas.Construction Of New Asphalt And Concrete Shared Pathwaysconstruction Of New Concrete Sidewalks, Curb And Gutter, V-Gutter, Curb Ramps, Median Islands, Slab-On Medians, And Commercial Crossingsconstruction Of Continuous Crossingspavement Milling And Overlay, Road Reconstruction, And Gutter Fillremoval, Abandonment, And Installation Of Drainage Infrastructure Including Catch Basins, Catch Basin Manholes, Cb/Cbmh Leads, And Perched Manholesremoval, Relocation, And Installation Of Street Lightsremoval And Installation Of Chain Link Fencinglandscape Remediation Of Disturbed Areas Including Topsoil And Sodtree Plantingwork Site Cleanup Warranty And Maintenancefinal Inspection And Contract Closeout
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.