Request For Quotation Osb Board, Thickness

Tender Detail

114250552
17164496
Self-Funded
Request For Quotation Osb Board, Thickness
NCB
Central Asia
Commonwealth of Independent States, CIS
15-06-2026

Work Detail

Specification And Technical Characteristics Of The Purchased Tonometer. Automatic Blood Pressure And Pulse Rate Meter (Hereinafter Referred To As The Device). Measurement Method – Oscillometric. The Range Of Measurement Of Air Pressure In The Cuff Is From 0 To 299 Mm. Rt. Art. The Blood Pressure Indication Range Is From 20 To 280 Mm. Rt. Art. The Range Of Pulse Rate Measurements Is From 40 To 180.1/Min. The Limits Of Permissible Absolute Error When Measuring Air Pressure In The Compression Cuff Are ±3 Mm Hg. Art. The Limits Of Permissible Relative Error When Measuring Pulse Rate Are ±5%. Compensation Is Automatic, Using An Electric Air Compressor. Decompression – Automatic Pressure Release Valve. Memory – 30 Measurements. Power Supply Parameters – Direct Current 6 V-4 W (Dc 6V). Power Source – 4 X 1.5V Aa Batteries Or Optional Ac Adapter (Input: 100-240V 50/60Hz, 0.12-0.065A Ac). Classification Of The Degree Of Protection Of The Shell: A) Electronic Unit – Ip20; B) Ac Adapter – Ip21. Operating Conditions: A) Ambient Temperature – From 10 To 40 ºс: B) Relative Humidity – From 15 To 90%; C) Atmospheric Pressure – From 700 To 1060 Hpa. Weight: A) Electronic Unit – No More Than 255 G (Without Batteries); B) Cuff – No More Than 170 G. Dimensions: A) Electronic Unit – No More Than 129X103x80 Mm; (Wxhxd); B) Cuff – No More Than 594X145 Mm (Wxh); Cuff: Arm Circumference – From 22 To 42 Cm. Cuff/Tube Material – Nylon, Polyester, Polyvin Chloride. Delivery Set: Electronic Unit; Compression Cuff Hem-Rml31, Instruction Manual, Case For Storing The Device, Ac Adapter Adapter-S (60240Hw5sw), Set Of Batteries, Blood Pressure Log, Warranty Card., Washbasin Compact 56Cm. Requirements For The Supplier 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Guide Profile, Length 3M, Size 100*40*0.4Mm. Supplier Requirements 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Square Profile Pipe, 40*40*1.5Mm. Requirements For The Supplier 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Acrylic Glossy Enamel For Radiators. Odorless; Color – White; Level Of Gloss – Glossy; The Enamel Base Is Acrylic; Packaging – Plastic Containers Of 0.8 Kg. Paint Consumption – 130-150 G/Sq.M Requirements For The Supplier. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Osb Board, Thickness 6Mm, Size 2500*1250Mm (Walls, Ceiling). Supplier Requirements 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Bimetal Radiator 500/100. 6 Sections. Requirements For The Supplier 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Roller Assembly 250 Mm, Pile 12 Mm, D48 Mm, Handle D 8 Mm. Requirements For The Supplier. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191. Roller Assembly 250 Mm, Pile 12 Mm, D48 Mm, Handle D 8 Mm. Requirements For The Supplier. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Mini Microfiber Roller 100 Mm D15 Mm Clasp 6 Mm Pile 12 Mm Premium. Requirements For The Supplier. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Flute Brush, Flat For All Types Of Paints And Varnishes, 4/100 Mm. Composition: Natural Light Bristles, Wooden Handle Requirements For The Supplier. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Osb Board, Thickness 22Mm, Size 2500*1250Mm (Floor). Requirements For The Supplier 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Water-Based Interior Paint, All-Season, 25 Kg Per Container. Acrylic Paint - Water-Based Paint For Walls And Ceilings Indoors, Matte, White, Light-Resistant, Wipeable. Increased Resistance To Yellowing; Dazzling Whiteness; Forms A Breathable Coating; Environmentally Friendly, Odorless, Non-Toxic; It Can Be Tinted With Water-Soluble Dyes Or Universal Pigment Pastes. Requirements For The Supplier. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Polystyrene Foam M-15, Sheet, Thickness 10Cm, 2*1*0.1M. Supplier Requirements 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Rolled Equal Flange Angle, 25*25*3Mm. Requirements For The Supplier 1. Payment Is Made After Delivery Of Materials And According To The Invoice. 2. The Warranty Period For Normal Operation Of The Goods Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. The Product Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For The Goods After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of The Goods By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of Organizations: Branch Of The Rse “Nc Cpms Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Acrylic Putty Purpose Of Putty – Universal. Condition Of The Material – Ready Mixture. Packaging – Plastic Jar. Packing Of Material (Kg) – 0.75. Color – White. Supplier Requirements. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191., Whiteness Bleach. Main Purpose - For Equipment, For Floors, For Containers And Containers, For Parts, For Equipment, For Walls, For Tables, For Pipelines. Volume – 1.1 L. Concentration – 5.5%. Delivery Form – Plastic Bottle. Supplier Requirements. 1. Payment Is Made After Delivery Of The Material (Goods) According To The Work Acceptance Certificate Or The Invoice For The Release Of Inventories To The Third Party. 2. The Warranty Period For Normal Operation Of The Material Is Set At Least 12 (Twelve) Months From The Date Of Signing By The Parties Of The Certificate Of Acceptance Of Work Completed Or The Invoice For The Release Of Inventories To The Third Party. 3. Materials Must Be New (Fresh), Not Previously Used. 4. The Delivery Time For Materials After Signing The Public Procurement Contract Is 5 (Five) Working Days. 5. Shortcomings And Defects Identified Upon Acceptance Of Materials By The Customer And During The Warranty Period Must Be Eliminated By The Supplier Within 3 (Three) Days At Its Own Expense. 6. Name Of The Customer: Branch Of The Rse “Nc Cpms Rk” “Kp” “Mps Rk” Institute Of Mining Named After. D. A. Kunaeva. 7. Customers Address: Almaty, Almaly District, Abay Ave., 191.

Key Value

Tender Value
13,06,092 - KZT

Attachment

FileName File Description
Global Tender Document 62e0c2ce-16b7-4f62-8a4f-052fbb31dc14.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp