GTR 114186469
Request For Quotation Purchasing Spare Parts
ICB — International Competitive Bid
Closed
Central Asia
Tender Information
GTR Reference
114186469
Tendering Authority
Subscribe to view
Tender No
17154319
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
11-06-2026
Closed
Work Detail
Aluminum-Copper Heat Exchanger; Thermal Power ≥35 Kw; System Pressure Up To 2 Bar; Operating Temperature Up To 120°C; Anti-Corrosion Coating; Tightness 100% Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Hydraulic Cylinder Pressure: Not Less Than 25 Mpa Test Pressure: Not Less Than 37 Mpa Rod Chrome: Not Less Than 25 Microns Rod Roughness: Ra ≤ 0.4 Straightness Deviation: ≤ 0.03Mm/M Resource: At Least 3000 Cycles Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Liquid Diesel Heater 30 Kw; Power Supply 24V; Built-In Circulation Pump; Operation At −40°C; Automatic Start; Protection Against Overheating Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Radiator Heat Dissipation: No Less Than 35 Kw Test Pressure: Not Less Than 2 Bar Mandatory Requirement: Reinforced Honeycomb (Anti-Vibration) Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Gear Motor 24V; Trapezoidal Drive; 2–3 Speeds; Graphite Brushes; Resource ≥100,000 Cycles; Protection Ip54 Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier
Key Value
Tender Value
457,758 - KZT
Tender Documents
Global Tender Document
3cf4e6c3-ff58-4481-b9bd-78dd9bff7bc8.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.