GTR 114186426
Request For Quotation Purchasing Spare Parts
ICB — International Competitive Bid
Closed
Central Asia
Tender Information
GTR Reference
114186426
Tendering Authority
Subscribe to view
Tender No
17154399
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
11-06-2026
Closed
Work Detail
Pre-Heater Power: At Least 30 Kw Availability: Overheat Protection Dry Running Protection Automatic Shutdown Mandatory Requirement: Operation At −40°C Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70 Equipment, Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Switches Resource: At Least 100,000 Cycles Contacts: Copper With Silver Plating Degree Of Protection: Not Lower Than Ip54 Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Dmk-70, Mp-7 And Mtz-82.1 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Hydraulic And Electrical Systems Of The Dmk-70 Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Reinforced Sleeves With 2–4 Layers Of Steel Braid; Working Pressure 25–40 Mpa; Burst Pressure ≥3×; Temperature Range −40…+100°C; Resistance To Oils, Fuels And Hydraulic Fluids Name Of Services (Equipment, Works, Products) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier, Industrial Roller Chain; Increased Tensile Strength; Load Up To 10–15 Kn; Hardened Links; Protection Against Wear And Stretching; Resource ≥2000 M/H Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier For Driving Brushes Of Mp-7 Equipment, Double Acting; Piston Diameter 80–100 Mm; Stroke 200–500 Mm; Working Pressure Up To 25 Mpa; Chrome Plated Rod (Coating Thickness ≥25 Microns); Polyurethane/Nbr Rubber Seals; Corrosion Protection; Resource ≥3000 Cycles Name Of Services (Equipment, Work, Product) – The Goods Supplied Must Be: New, Not Used; Manufactured No Earlier Than 24 Months; Comply With The Requirements Of Tr Cu 010/2011 And Tr Cu 018/2011; Fully Compatible With Mp-7 Equipment Without Modifications; Have A Guarantee Of At Least 12 Months. Additional Requirements Factory Production (Oem Or Oem Equivalent) Certificates Of Conformity With Tr Cu Are Required Acceptance Of Original Or Equivalent Parts Only Compatibility Installation Without Design Changes Full Integration Into The Mp-7 Hydraulic And Electrical Systems Warranty At Least 12 Months Replacement Of Defective Products At The Expense Of The Supplier Acceptance Of Goods Incoming Quality Control Checking Labels And Passports Checking The Completeness Visual Inspection If Necessary, Test In Operation Delivery Terms Terms: Ddp (Incoterms 2020) Unloading By The Supplier
Key Value
Tender Value
508,620 - KZT
Tender Documents
Global Tender Document
ddf14d3a-4cc1-4c94-a4cd-12133fe32e2c.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.