Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
12-06-2026
Work Detail
Quotation are invited for WHRB 51 Tubes /Headers Inspection Cap Cutting, Welding and Borescope Inspection 1032602509 1 ITEM-00001 TECHNICAL AND GENERAL SPECIFICATION OF WORK AT K STN, JEBEL ALI POWERSTATION.1.#TITLE: WHRB 51 TUBES /HEADERS INSPECTION CAP CUTTING , WELDING ANDBORESCOPE INSPECTION.2.#QUANTITY: INSPECTION CAP WILL BE CUT ON HEADERS BY DEWA FOR ACCESS.MAXIMUM NUMBER OF ACCESSIBL E TUBES AND HEADERS SECTION SHALL BEINSPECTED BY BORESCOPE. REFER BELOW LOCATION DETAILSS.NO#UNIT#LOCATION#MATERIAL.#QTY#1# WHRB 51#H PLTSH 1#A 335 P22#3#2#WHRB 51#HPLTSH 2#A 335 P22#6#3#WHRB 51#HPHTSH #A 335 P91#6#4#WHRB 51#HP EVAPORATOR#A 106 GR.B#12#5#WHRB 51#HP ECONOMIZER 1#A 106 GR.B#18#6#WHRB 51#HP ECONOMIZER 2#A 106 GR.B#18#3.#DURATION: 05 DAY4.#SCOPE OF WORK:4.1.#MOBILIZE TEAM/EQUIPMENT WITHIN 01 DAYS OF ADVANCE NOTICE.4.2.#SUBMIT FOLLOWING DOCUMENTS TO OBTAIN 1 LS PTW,4.2.1.#METHOD STATEMENT4.2.2.#RISK ASSESSMENT OF THE WORK4.2.3.#TOOLBOX TALK REPORT.4.3.#OBTAIN PTW (PERMIT TO WORK), LC (LINE CLEARANCE) & CONFINE SPACEENTRY PERMIT FROM DEWA.4.4.#COND UCT SITE SURVEY AND SAFETY INSPECTION, TO ASSESS THE WORKINGENVIRONMENT.4.5.#BEFORE START OF WORK ENSURE AREA IS CORRECTLY SECURED A ND SAFE TOWORK ON IN ALL RESPECTS, REPORT IF ANY ISSUE / OBSERVATION TO DEWAENGINEER.4.6.#IDENTIFY AND CUT INSPECTION NOZZLES CAPS O N ALL RELEVANT HEADERSTO ALLOW ACCESS FOR INTERNAL INSPECTION OF TUBES AND HEADERS. SAME ENDCAP SHALL BE REUSED.4.7.#OPEN DOWNCOMER FLANGES TO ALLOW ACCESS FOR INTERNAL INSPECTION OFHEADERS.4.8.#OPEN ATTEMPERATOR FOR HP DESUPERHEATER4.9.#IF THE WORKING ENVIRONMENT IS SAFE, PROCEED WITH THE BORESCOPEINSPECTION.4.10.#ASSESS THE INTERNAL CONDITIONS OF TUBES & HEADERS. ARTICULATINGBORESCOPE SHALL BE USED TO IDENTIFY ANY SCABBING, PITTING, SCALE BUILDUP, CORROSION, LAYER FORMATION, OVERHEATING AND ANY OTHER SIGNIFICANTFINDINGS. MAXIMUM NUMBER OF ACCESSIBLE TUBES TO BE INSPECTED ON EACHHEADER CHECK DE-SUPER HEATER NOZZLE CONDITION BY BORESCOPE. REINSTATEALL HEADER INSPECTION NOZZLES CAPS WHICH HAVE BEEN REMOVED. ALL WELDINGTO BE CARRIED OUT AS PER CLASS APPROVED WELDING PROCEDURES4.11.# IN CASE OF ANY SIGNIFICANT INSPECTION FINDING, SAME SHALL BEBROUGHT TO THE NOTICE OF DEWA. SPECIAL NOTES / INSTRUCTIONS: WHRB 51 Tubes /Headers inspection cap cutting , welding and Borescope inspection Contact person : Kaliyamoorthi: Ph-0529126916 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601330)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.