GTR 114153433
Tenders Are Invited For Retrofitting The Zss Workshop In Łódź As Part Of The Project Entitled: Mechanic Of The Future - Ii
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
114153433
Tendering Authority
Subscribe to view
Tender No
ZSS/26/23/ZP/3/2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Retrofitting The Zss Workshop In Łódź As Part Of The Project Entitled: Mechanic Of The Future - Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
15-06-2026
Closed
Work Detail
3.1. Subject Of The Order: Retrofitting The Zss Workshop In Łódź As Part Of The Project Entitled: Mechanic Of The Future - Ii No. Feld.08.08.-Iz.00-0026/23, Co-Financed By The European Social Fund Plus Under The Regional Program European Funds For Łódź 2021-2027. 3.2. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 7 - 7.1. To 7.4. To Swz For A Given Part Of The Order. Zamówienie Zostało Podzielone Na 2 Części, W Tym W Szczególności Dostawa:3.2.1. Część Nr 1: Drukarka Kod Cpv: 30232110-8 – Drukarki Laserowe, 30232000-4 Sprzęt Peryferyjny,3.2.2. Part No. 2: Teaching Set, Compressors, Universal Table With Switchboard, Pneumatics Set With Horizontal Mounting Plate, Electrotechnical Set For Self-Assembly, Mock-Up For Learning Software - Educational Package, Cpv Code: 39162100-6 Teaching Aids, 39162110-9 Teaching Equipment 3.3. The Scope Of The Order Includes The Delivery Of New, Non-Exhibition Equipment To The Ordering Partys Headquarters. Delivered Equipment - Devices Must Have Operating Instructions In Polish (And How Many Are Required), Must Be Covered By At Least The Warranty Period - Specified For A Given Device, Equipment In Annex No. 7 To The Swz - For A Given Part Of The Order.3.4. The Contractor Is Obliged To Attach To The Offer - Annex No. 7. 7.1. -7.2. To Swz Technical Parameters Completed - For All Offered Devices, Equipment, Equipment, Including In Particular - Information About The Manufacturers Name, Model Name / Manufacturers Catalog Number For The Offered Devices, Part Number. If The Manufacturer Does Not Assign The Above Names/Catalog Number To The Devices, The Contractor Will Attach A Statement That The Manufacturer Does Not Assign These Names To The Devices. The Attached Descriptions And Documents Must Enable The Ordering Party To Verify The Solutions Offered By The Contractor In Terms Of The Required Technical And Functional Parameters. Failure To Submit Annex No. 7. 7.1 – 7.2. Do Swz Stanowi Brak Możliwości Oceny Oferty A Tym Samym Podstawę Odrzucenia Oferty Z Postępowania.5.1. The Contractor Is Obliged To Complete The Order Within: 14 Days From The Date Of Signing The Public Procurement Contract. The Contractor May Shorten The Order Completion Date By A Maximum Of 7 Days. Shortening The Order Completion Time Is One Of The Offer Evaluation Criteria. The Shortening Of The Order Completion Deadline Is Specified By The Contractor In Days - In The Offer Form - Annex No. 1 To The Swz, Specifying How Many Days He Shortens The Order Completion Deadline In Relation To The Maximum Deadline.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d0c3a6f0-f081-4cf1-a22e-e5f22315ca15.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.