The City Of Kaarina Is Asking For Bids For The Preparation Of A Partial Master Plan For Piikkiö. The Assignment Also Includes The Preparation Of A Traffic Network Survey To Be Done Alongside The Master Plan Work.Backgroundpiikkiös Sub-Master Plan Area Is Divided Into Two Parts: The Sub-Master Plan For The Agglomeration And The Sub-Master Plan Along The Ring Road, But The Work Is Carried Out As A Single Entity. In The Area Of The Agglomeration, There Is A Partial Master Plan From 1999 Without Legal Effect. Land Use Planning In The Area Is Currently Guided By The Provincial Plan. The Area Of The Piikkiö Agglomeration Is Designated In The Provincial Plan As A Target Area For Urban Development, And The Area Belongs To The Regional Centers Of The Nearby Area To Be Developed In The Structural Model Of The Turku Urban Region. The Arm Of The Ring Road Is Designated In The Provincial Plan As A Target Area For The Development Of Industry And Logistics. Objective The Goal Of The General Plan Is To Define The Guidelines For Land Use In The Piikkiö Area, Where The Core Issues For The Urban Area Include E.G. The Growth Of The Population, The Development Of The Agglomeration And The Local Train Connection, And The Development Of The Area Along The Ring Road For Business Activities. The Assignment Of The General Plan Work Includes The Preparation Of A Transport Network Report. Assignment The Assignment Includes All Planning Work Phases For The General Plan Work: Updates Of The Participation And Evaluation Plan, Preparation Of The Transport Network Report, Preparation Of Alternative Structural Models As A Basis For The Draft Plan, Preparation Of The Draft Plan And Plan Proposal, And Preparation Of Acceptable Plan Documents. The Editor Prepares Responses To Opinions, Statements And Reminders And Is Responsible For The Participation And Organization Of Interaction Related To The Design Work, The Main Part Of Which Must Take Place On Site. The Supplier Is Required To Interact With The Citys Various Administrative Units, Authorities, Municipal Residents And Other Stakeholders, As Well As To Participate In Official Negotiations. The Supplier Undertakes To Report Regularly To The Client On The Progress Of The Work. The Assignment Is To Prepare The Master Plan Until Approval By The City Council. The Subscriber Is Responsible For The Tasks Assigned To The Municipal Authorities By Law Or Regulation. The Subscriber Uses Maptionnaire, Which Can Be Used For Map-Based Participation. The Documents To Be Produced By The Supplier Are: - Transport Network Report (Own Report) - Participation And Evaluation Plan (Updates) - Alternative Structural Models As A Basis For The Plan Draft (At Least 3-4 Alternatives) - Partial General Plan Draft With Plan Reports And Attachments - Partial General Plan Proposal With Plan Reports And Attachments - Final, Approved Plan Documents (Plan Map, Plan Statement And Appendices) Formula Documents And Materials Are Prepared In Finnish And Delivered To The Customer At All Stages Of The Formula Process In Electronic Format (E.G. Accessible Pdf/A File And Powerpoint Presentation) And Spatial Data Format (E.G. Shapefile And Json). The Tenderer Must Take Into Account The Compatibility With The Ryhti Data Model From The Beginning Of The Work. Transport Network Survey The Transport Network Survey Is Carried Out In Connection With The Master Plan Work As Its Own Project, For Which A Separate Report Is Produced. The Purpose Of The General Plan-Level Transport Network Survey Is To Support The Regional Transport System Plan And The Goals Of The Provincial Level. The Report Must Present An Analysis Of The Current Situation And A Presentation Of The Target-Oriented Transport Network. From The Point Of View Of Planning The Area, Key Transport Projects And Themes To Be Considered In The Report Include: - Turku-Helsinki High-Speed Train Connection Development Project (Länsirata) And The Possibilities Of Local Train Traffic And The Location Of Local Train Stops, - Improving The Turku Ring Road Between Kausela-Kirismäki, - Exploring The Road Connection Between Raadelma-Pukkila, And - The Future Traffic Solution For The Salvelanlaakso Bridge. In Addition, The Report Should Examine The Accessibility Of Public Transport Links (Including Commuter Rail) And The Relationship With New Construction, As Well As The Development Of Light Traffic Routes In The Area.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.