The Assignment Will Be Carried Out In Woubrugge And Includes The Construction Of Four (4) Luwte Dams. The Work, Within The Meaning Of The Uav 2012, Mainly Consists Of: - Installing Zinc Pieces; - Removing Lava Rock From Silos; - Transporting And Applying Lava Rock To The Target Location; - Applying Rubble Stone; - Mechanically Excavating And Removing The Sludge Layer; - Extraction Of Solid Water Sediment From The Navigation Channel; - Processing Soil In The Deepening; - Installing Mooring Posts And Contour Posts; - Planting Reeds And Applying Feeding Protection; - Remove Vegetation; - Felling, Pollarding And Pruning Trees; - Installing Closing Facilities (Ball Lines); - Installing Signage Along The Breakwater Route; - Other Constructions. The Entire Work Must Be Completed No Later Than 28-02-2027 And Must Always Meet The Requirements Set Out In Appendix 2, Specifications Upon Delivery. After Delivery, A Maintenance Period Of 12 Months Applies, In Accordance With Paragraph 11, Paragraph 1 Uav 2012, As Included In Appendix 2, Specifications, 1. General, 06 Maintenance Period.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.