The Planned Construction Project Is A Comprehensive Replacement Project For The Kiesberg Tunnel On The L 70 State Road. A Characteristic Feature Of The Road Tunnel, Which Was Put Into Operation In 1970, Is Its Two-Story Design, In Which The Two Two-Lane Carriageways Are Largely Routed One Above The Other. Due To Outdated Operating Technology And Age-Related Concrete Damage, There Is A Significant Need For Renovation. The Structural Peculiarities Of The Engineering Structure Lead To Increased Demands On The Planning And Implementation Of The Measure. Part Of The Project Is Also A Replacement Building For The Missing Overpass Structure On The L 70 Over Viehhofstrasse. A Detailed Description Of The Project And Its Scope Can Be Found In Appendix 8 Project Information (Part Of The Tender Documents).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.